IAC Assessment: UW2507
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UW2507
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Washington
Assessment Year 2025
Principal Product Treated sewage and food processing waste water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 1,248,000
Annual Production 3,345,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $702,249 8,715,000 kWh $0.08
Electricity Demand $92,755 15,232 kW-months/year $6.09
Electricity Fees $74,473 - $ -
Natural Gas $205,358 12,140 MMBtu $16.92
Other Gas $7,468 1 MMBtu $7,468.00
TOTAL ENERGY COSTS $1,082,303
RECOMMENDED SAVINGS* $776,392 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$170,715
Cost:
$5,537,300
$15,015 186,288 $5,700 936 - - $150,000 - $15,015
186,288
kWh
$5,700
936
kW-months/year
-
-
MMBtu
$150,000
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$38,542
Cost:
$289,575
$38,542 478,192 - - - - - - $38,542
478,192
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 4.463 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS Savings:
$5,795
Cost:
$10,336
- - - - - - $5,795 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,795
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$399,297
Cost:
$329,940
- - - - $399,297 23,605 - - -
-
kWh
-
-
kW-months/year
$399,297
23,605
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$37,086
Cost:
$16,198
$33,608 416,976 $3,478 571 - - - - $33,608
416,976
kWh
$3,478
571
kW-months/year
-
-
MMBtu
-
-
$
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$124,957
Cost:
$342,000
- - - - - - $124,957 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$124,957
-
$
TOTAL RECOMMENDED Savings:
$776,392
Cost:
$6,525,349
$87,165 1,081,456 $9,178 1,507 $399,297 23,605 $280,752 - $87,165
1,081,456
kWh
$9,178
1,507
kW-months/year
$399,297
23,605
MMBtu
$280,752
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost