Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2012
Principal Product Technical Test
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 458,000
Annual Production 100,000 Units
Production Hrs. Annual 6,240
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,102,815 18,458,584 kWh $0.06
Electricity Demand $542,599 49,862 kW-months/year $10.88
Electricity Fees $151,570 - $ -
Natural Gas $397,941 87,354 MMBtu $4.56
TOTAL ENERGY COSTS $2,194,925
RECOMMENDED SAVINGS* $86,978 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,760
Cost:
-
$16,760 336,960 - - - - $16,760
336,960
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,834
Cost:
-
$8,834 147,744 - - - - $8,834
147,744
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,802
Cost:
-
$1,464 20,956 $1,338 123 - - $1,464
20,956
kWh
$1,338
123
kW-months/year
-
-
MMBtu
04: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$40,676
Cost:
$83,400
- - - - $40,676 8,928 -
-
kWh
-
-
kW-months/year
$40,676
8,928
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,551
Cost:
$1,000
$1,853 26,532 $1,698 156 - - $1,853
26,532
kWh
$1,698
156
kW-months/year
-
-
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,737
Cost:
-
$2,737 49,191 - - - - $2,737
49,191
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$432
Cost:
$520
$432 6,641 - - - - $432
6,641
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,209
Cost:
$990
$1,209 18,275 - - - - $1,209
18,275
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$9,137
Cost:
$3,034
$9,137 130,810 - - - - $9,137
130,810
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$840
Cost:
$400
$840 12,025 - - - - $840
12,025
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$86,978
Cost:
$89,344
$43,266 749,134 $3,036 279 $40,676 8,928 $43,266
749,134
kWh
$3,036
279
kW-months/year
$40,676
8,928
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas