IAC logo
IAC Assessment: WM0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2013
Principal Product Heavy Military Trucks and Trailers
NAICS 336120 - Heavy Duty Truck Manufacturing
SIC 3711 - Motor Vehicles And Car Bodies
Sales $5,000,000-$10,000,000
# of Employees 830
Plant Area (Sq.Ft.) 261,000
Annual Production 3,385 Pieces
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $421,420 7,893,759 kWh $0.05
Electricity Demand $232,627 28,409 kW-months/year $8.19
Electricity Fees $37,846 - $ -
Natural Gas $298,129 63,943 MMBtu $4.66
LPG $64,474 4,488 MMBtu $14.37
TOTAL ENERGY COSTS $1,115,545
RECOMMENDED SAVINGS* $61,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,398
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,439
Cost:
$1,853
- - - - $1,439 301 - - -
-
kWh
-
-
kW-months/year
$1,439
301
MMBtu
-
-
$
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$17,111
Cost:
$9,180
- - - - $17,111 3,672 - - -
-
kWh
-
-
kW-months/year
$17,111
3,672
MMBtu
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,234
Cost:
$4,550
$2,234 30,891 - - - - - - $2,234
30,891
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,570
Cost:
$500
$1,526 27,264 $44 6 - - - - $1,526
27,264
kWh
$44
6
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,064
Cost:
-
$1,064 14,582 - - - - - - $1,064
14,582
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$34,398
Cost:
$69,000
- - - - $34,398 7,382 - - -
-
kWh
-
-
kW-months/year
$34,398
7,382
MMBtu
-
-
$
07: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$3,034
Cost:
-
- - - - - - $3,034 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,034
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$473
Cost:
$546
$473 8,080 - - - - - - $473
8,080
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$61,323
Cost:
$85,629
$5,297 80,817 $44 6 $52,948 11,355 $3,034 - $5,297
80,817
kWh
$44
6
kW-months/year
$52,948
11,355
MMBtu
$3,034
-
$
TOTAL IMPLEMENTED Savings:
$34,398
Cost:
$69,000
- - - - $34,398 7,382 - - -
-
kWh
-
-
kW-months/year
$34,398
7,382
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost