Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2014 |
Principal Product | Fiberglass Tubing |
NAICS | 326130 - Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 54 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 50,000 Pieces |
Production Hrs. Annual | 4,950 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $132,422 | 1,921,419 | kWh | $0.07 |
Electricity Demand | $75,330 | 5,960 | kW-months/year | $12.64 |
Electricity Fees | $13,670 | - | $ | - |
Natural Gas | $28,269 | 4,339 | MMBtu | $6.52 |
TOTAL ENERGY COSTS | $316,575 | |||
RECOMMENDED SAVINGS* | $46,987 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,503 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,035 Cost: $343 |
$700 | 10,152 | $335 | 27 | - | - | - | - |
$700 10,152 kWh |
$335 27 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $484 Cost: - |
$328 | 4,749 | $156 | 12 | - | - | - | - |
$328 4,749 kWh |
$156 12 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $2,884 Cost: $2,300 |
$2,884 | 41,847 | - | - | - | - | - | - |
$2,884 41,847 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $116 Cost: $240 |
$116 | 1,688 | - | - | - | - | - | - |
$116 1,688 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $12,733 Cost: $9,000 |
$7,444 | 108,005 | $5,289 | 419 | - | - | - | - |
$7,444 108,005 kWh |
$5,289 419 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $12,389 Cost: $850 |
$12,389 | 179,761 | - | - | - | - | - | - |
$12,389 179,761 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $8,503 Cost: - |
$8,503 | 123,379 | - | - | - | - | - | - |
$8,503 123,379 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $1,492 Cost: $5,970 |
- | - | - | - | $1,492 | 229 | - | - |
- - kWh |
- - kW-months/year |
$1,492 229 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,043 Cost: $610 |
- | - | - | - | $1,043 | 158 | - | - |
- - kWh |
- - kW-months/year |
$1,043 158 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,931 Cost: $5,000 |
- | - | - | - | - | - | $4,931 | 26,504 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,931 26,504 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $1,377 Cost: - |
- | - | - | - | - | - | $1,377 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,377 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,987 Cost: $24,313 |
$32,364 | 469,581 | $5,780 | 457 | $2,535 | 387 | $6,308 | 26,504 | $32,364 469,581 kWh |
$5,780 457 kW-months/year |
$2,535 387 MMBtu |
$6,308 26,504 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,503 Cost: - |
$8,503 | 123,379 | - | - | - | - | - | - | $8,503 123,379 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |