IAC logo
IAC Assessment: WM0048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2014
Principal Product Metal heat treating and Blasting
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 50,000
Annual Production 8,500,000 Tons
Production Hrs. Annual 6,240
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,328 1,465,344 kWh $0.07
Electricity Demand $67,483 5,194 kW-months/year $12.99
Electricity Fees $23,981 - $ -
Natural Gas $319,946 55,044 MMBtu $5.81
TOTAL ENERGY COSTS $535,982
RECOMMENDED SAVINGS* $30,114 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,381
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,124
Cost:
$239
$2,293 33,470 $831 64 $2,293
33,470
kWh
$831
64
kW-months/year
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$18,624
Cost:
$53,646
$13,648 199,236 $4,976 383 $13,648
199,236
kWh
$4,976
383
kW-months/year
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,471
Cost:
$270
$1,811 26,431 $660 51 $1,811
26,431
kWh
$660
51
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$733
Cost:
$570
$733 10,695 - - $733
10,695
kWh
-
-
kW-months/year
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,162
Cost:
$24,038
- - $5,162 397 -
-
kWh
$5,162
397
kW-months/year
TOTAL RECOMMENDED Savings:
$30,114
Cost:
$78,763
$18,485 269,832 $11,629 895 $18,485
269,832
kWh
$11,629
895
kW-months/year
TOTAL IMPLEMENTED Savings:
$29,381
Cost:
$78,193
$17,752 259,137 $11,629 895 $17,752
259,137
kWh
$11,629
895
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand