IAC logo
IAC Assessment: WM0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Frac sand
NAICS 212322 - Industrial Sand Mining
SIC 1446 - Industrial Sand
Sales $50,000,000-$100,000,000
# of Employees 68
Plant Area (Sq.Ft.) 5,500,000
Annual Production 1,300,000 Units
Production Hrs. Annual 8,400
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $708,794 11,511,080 kWh $0.06
Electricity Demand $237,904 23,147 kW-months/year $10.28
Electricity Fees $17,275 - $ -
Natural Gas $592,009 156,892 MMBtu $3.77
LPG $41,228 2,212 MMBtu $18.63
TOTAL ENERGY COSTS $1,597,210
RECOMMENDED SAVINGS* $93,994 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$29,687
Cost:
$58,519
$24,003 387,140 $5,684 553 - - - - $24,003
387,140
kWh
$5,684
553
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$19,679
Cost:
$3,000
- - - - - - $19,679 1,058 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,679
1,058
MMBtu
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$14,992
Cost:
$10,774
- - - - - - $14,992 806 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,992
806
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,178
Cost:
$18,800
- - $13,178 1,282 - - - - -
-
kWh
$13,178
1,282
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,210
Cost:
$3,000
$5,021 80,981 $1,189 116 - - - - $5,021
80,981
kWh
$1,189
116
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,749
Cost:
$2,780
- - - - $4,749 1,270 - - -
-
kWh
-
-
kW-months/year
$4,749
1,270
MMBtu
-
-
MMBtu
07: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$3,298
Cost:
$28,500
- - - - $3,298 882 - - -
-
kWh
-
-
kW-months/year
$3,298
882
MMBtu
-
-
MMBtu
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$980
Cost:
-
$662 10,672 $318 31 - - - - $662
10,672
kWh
$318
31
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$865
Cost:
$345
$700 11,290 $165 16 - - - - $700
11,290
kWh
$165
16
kW-months/year
-
-
MMBtu
-
-
MMBtu
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$356
Cost:
-
$214 3,456 $142 14 - - - - $214
3,456
kWh
$142
14
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$93,994
Cost:
$125,718
$30,600 493,539 $20,676 2,012 $8,047 2,152 $34,671 1,864 $30,600
493,539
kWh
$20,676
2,012
kW-months/year
$8,047
2,152
MMBtu
$34,671
1,864
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG