IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Treated Wastewater and Salable Fertilizer
NAICS 221320 - Sewage Treatment Facilities
SIC 4953 - Refuse Systems
Sales $100,000,000-$500,000,000
# of Employees 232
Plant Area (Sq.Ft.) 3,000,000
Annual Production 70,000,000 Thousand Gallons
Production Hrs. Annual 8,736
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $564,652 9,997,843 kWh $0.06
Electricity Demand $310,076 22,936 kW-months/year $13.52
Electricity Fees $193,595 - $ -
Natural Gas $5,914,140 1,579,742 MMBtu $3.74
TOTAL ENERGY COSTS $6,982,463
RECOMMENDED SAVINGS* $268,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$135,557
Cost:
$350,000
$135,557 1,847,585 - - - - $135,557
1,847,585
kWh
-
-
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$38,256
Cost:
$90,000
$38,256 677,335 - - - - $38,256
677,335
kWh
-
-
kW-months/year
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$30,600
Cost:
$7,500
$23,028 407,723 $7,572 560 - - $23,028
407,723
kWh
$7,572
560
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,084
Cost:
$45,000
$18,136 321,127 $5,948 440 - - $18,136
321,127
kWh
$5,948
440
kW-months/year
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,424
Cost:
$56,250
$17,638 312,374 $5,786 428 - - $17,638
312,374
kWh
$5,786
428
kW-months/year
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$16,506
Cost:
$73,860
$12,383 219,240 $2,771 205 $1,352 - $12,383
219,240
kWh
$2,771
205
kW-months/year
$1,352
-
$
TOTAL RECOMMENDED Savings:
$268,427
Cost:
$622,610
$244,998 3,785,384 $22,077 1,633 $1,352 - $244,998
3,785,384
kWh
$22,077
1,633
kW-months/year
$1,352
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes