IAC Assessment: WM0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2017
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 5
Plant Area (Sq.Ft.) 165,000
Annual Production 1,642,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,175 3,967,397 kWh $0.05
Electricity Demand $75,425 6,236 kW-months/year $12.10
Electricity Fees $0 - $ -
Natural Gas $57,087 11,149 MMBtu $5.12
TOTAL ENERGY COSTS $325,687
RECOMMENDED SAVINGS* $51,864 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,215
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$16,398
Cost:
$20,000
$12,237 251,324 $4,161 344 - - $12,237
251,324
kWh
$4,161
344
kW-months/year
-
-
MMBtu
02: 2.9111 USE SOLAR HEAT TO HEAT MAKE-UP AIR Savings:
$13,132
Cost:
$72,000
$13,132 269,711 - - - - $13,132
269,711
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,735
Cost:
$23,350
$4,284 87,989 $1,451 120 - - $4,284
87,989
kWh
$1,451
120
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,449
Cost:
$332
$4,066 83,500 $1,384 114 - - $4,066
83,500
kWh
$1,384
114
kW-months/year
-
-
MMBtu
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,330
Cost:
$1,815
- - - - $4,330 846 -
-
kWh
-
-
kW-months/year
$4,330
846
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,167
Cost:
$1,660
$2,363 48,532 $804 67 - - $2,363
48,532
kWh
$804
67
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,956
Cost:
-
$827 16,988 $1,129 93 - - $827
16,988
kWh
$1,129
93
kW-months/year
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,082
Cost:
$3,200
$756 15,516 $327 27 - - $756
15,516
kWh
$327
27
kW-months/year
-
-
MMBtu
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$615
Cost:
$73
$459 9,424 $156 13 - - $459
9,424
kWh
$156
13
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,864
Cost:
$122,430
$38,123 782,984 $9,411 778 $4,330 846 $38,123
782,984
kWh
$9,411
778
kW-months/year
$4,330
846
MMBtu
TOTAL IMPLEMENTED Savings:
$29,215
Cost:
$25,347
$17,885 367,328 $7,000 579 $4,330 846 $17,885
367,328
kWh
$7,000
579
kW-months/year
$4,330
846
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas