IAC logo
IAC Assessment: WM0153
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0153
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2020
Principal Product Waster Water treatment plant
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 4
Plant Area (Sq.Ft.) 240,780
Annual Production 1,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,257 794,040 kWh $0.05
Electricity Demand $17,752 1,972 kW-months/year $9.00
Electricity Fees $2,823 - $ -
Natural Gas $1,824 221 MMBtu $8.24
TOTAL ENERGY COSTS $59,656
RECOMMENDED SAVINGS* $19,186 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $376
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$7,809
Cost:
$75,000
$6,557 139,754 - - $1,252 152 $6,557
139,754
kWh
-
-
kW-months/year
$1,252
152
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,227
Cost:
$20,000
- - - - $4,227 513 -
-
kWh
-
-
kW-months/year
$4,227
513
MMBtu
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,015
Cost:
$6,600
$3,015 64,293 - - - - $3,015
64,293
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,170
Cost:
$5,633
$1,720 36,662 $450 50 - - $1,720
36,662
kWh
$450
50
kW-months/year
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,114
Cost:
$232
- - - - $1,114 135 -
-
kWh
-
-
kW-months/year
$1,114
135
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$475
Cost:
$2,110
$376 8,016 $99 11 - - $376
8,016
kWh
$99
11
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$376
Cost:
$25
$298 6,340 $78 9 - - $298
6,340
kWh
$78
9
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$19,186
Cost:
$109,600
$11,966 255,065 $627 70 $6,593 800 $11,966
255,065
kWh
$627
70
kW-months/year
$6,593
800
MMBtu
TOTAL IMPLEMENTED Savings:
$376
Cost:
$25
$298 6,340 $78 9 - - $298
6,340
kWh
$78
9
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas