IAC logo
IAC Assessment: WM0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2021
Principal Product concrete plants
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 83
Plant Area (Sq.Ft.) 90,000
Annual Production 32 Pieces
Production Hrs. Annual 4,048
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,670 1,357,001 kWh $0.06
Electricity Demand $67,844 4,543 kW-months/year $14.93
Electricity Fees $20,766 - $ -
Natural Gas $27,241 4,827 MMBtu $5.64
TOTAL ENERGY COSTS $196,521
RECOMMENDED SAVINGS* $26,657 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,220
Cost:
$10,675
- - - - $12,220 2,167 -
-
kWh
-
-
kW-months/year
$12,220
2,167
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$9,928
Cost:
$36,500
$6,368 107,116 $3,560 238 - - $6,368
107,116
kWh
$3,560
238
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,884
Cost:
$3,500
$1,209 20,331 $675 45 - - $1,209
20,331
kWh
$675
45
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,198
Cost:
$2,170
$768 12,921 $430 29 - - $768
12,921
kWh
$430
29
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,099
Cost:
$1,200
$705 11,860 $394 26 - - $705
11,860
kWh
$394
26
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$328
Cost:
$1,500
$328 5,521 - - - - $328
5,521
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,657
Cost:
$55,545
$9,378 157,749 $5,059 338 $12,220 2,167 $9,378
157,749
kWh
$5,059
338
kW-months/year
$12,220
2,167
MMBtu
TOTAL IMPLEMENTED Savings:
$1,198
Cost:
$2,170
$768 12,921 $430 29 - - $768
12,921
kWh
$430
29
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas