IAC logo
IAC Assessment: WM0176
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0176
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2022
Principal Product Treated water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 37,730
Annual Production 2,737,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,748 4,936,013 kWh $0.06
Electricity Demand $130,583 9,206 kW-months/year $14.18
Electricity Fees $41,018 - $ -
Natural Gas $32,405 4,606 MMBtu $7.04
TOTAL ENERGY COSTS $480,754
RECOMMENDED SAVINGS* $65,447 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$38,336
Cost:
$48,250
$28,463 508,275 $9,873 696 - - $28,463
508,275
kWh
$9,873
696
kW-months/year
-
-
MMBtu
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$12,068
Cost:
$10,000
$8,962 160,034 $3,107 219 - - $8,962
160,034
kWh
$3,107
219
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,319
Cost:
$24,625
- - $6,319 445 - - -
-
kWh
$6,319
445
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,784
Cost:
$7,000
- - - - $4,784 680 -
-
kWh
-
-
kW-months/year
$4,784
680
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,638
Cost:
$6,572
$2,085 37,235 $553 39 - - $2,085
37,235
kWh
$553
39
kW-months/year
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,301
Cost:
-
- - - - $1,301 185 -
-
kWh
-
-
kW-months/year
$1,301
185
MMBtu
TOTAL RECOMMENDED Savings:
$65,447
Cost:
$96,447
$39,510 705,544 $19,851 1,399 $6,085 865 $39,510
705,544
kWh
$19,851
1,399
kW-months/year
$6,085
865
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas