IAC logo
IAC Assessment: WM0191
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0191
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2023
Principal Product Wastewater Treatment Plant
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 25
Plant Area (Sq.Ft.) 1,672,000
Annual Production 15,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $652,343 10,872,383 kWh $0.06
Electricity Demand $266,041 17,349 kW-months/year $15.33
Natural Gas $20,105 2,446 MMBtu $8.22
TOTAL ENERGY COSTS $938,489
RECOMMENDED SAVINGS* $47,064 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,450
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$25,222
Cost:
$237,351
$25,222 420,368 - - - - $25,222
420,368
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,731
Cost:
$32,670
$22,652 377,546 $6,195 404 $(-12,116) 1,474 $22,652
377,546
kWh
$6,195
404
kW-months/year
$(-12,116)
1,474
MMBtu
03: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$2,392
Cost:
$5,000
- - - - $2,392 291 -
-
kWh
-
-
kW-months/year
$2,392
291
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,985
Cost:
$2,600
$1,470 24,506 $515 34 - - $1,470
24,506
kWh
$515
34
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$733
Cost:
-
$549 9,149 $184 12 - - $549
9,149
kWh
$184
12
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$47,064
Cost:
$277,621
$49,893 831,569 $6,895 450 $(-9,724) 1,765 $49,893
831,569
kWh
$6,895
450
kW-months/year
$(-9,724)
1,765
MMBtu
TOTAL IMPLEMENTED Savings:
$19,450
Cost:
$35,270
$24,671 411,201 $6,895 450 $(-12,116) 1,474 $24,671
411,201
kWh
$6,895
450
kW-months/year
$(-12,116)
1,474
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas