IAC logo
IAC Assessment: WM0209
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0209
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2024
Principal Product Plastic manufacturer
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 74
Plant Area (Sq.Ft.) 55,000
Annual Production 348,333,628 Pounds
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $554,859 9,381,600 kWh $0.06
Electricity Demand $139,202 15,448 kW-months/year $9.01
Electricity Fees $272,823 - $ -
Natural Gas $27,722 3,325 MMBtu $8.34
TOTAL ENERGY COSTS $994,606
RECOMMENDED SAVINGS* $26,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$9,737
Cost:
-
- - - - $9,737 - -
-
kWh
-
-
kW-months/year
$9,737
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,576
Cost:
$1,700
$2,746 46,538 $4,830 536 - - $2,746
46,538
kWh
$4,830
536
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,061
Cost:
$3,250
$3,358 56,921 $703 78 - - $3,358
56,921
kWh
$703
78
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,372
Cost:
-
$3,615 61,265 $757 84 - - $3,615
61,265
kWh
$757
84
kW-months/year
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,224
Cost:
-
$999 16,932 $225 25 - - $999
16,932
kWh
$225
25
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$26,970
Cost:
$4,950
$10,718 181,656 $6,515 723 $9,737 - $10,718
181,656
kWh
$6,515
723
kW-months/year
$9,737
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees