IAC logo
IAC Assessment: WM0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2024
Principal Product waste water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 103
Plant Area (Sq.Ft.) 2,257,403
Annual Production 30,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,631,751 32,792,636 kWh $0.05
Electricity Demand $738,336 58,899 kW-months/year $12.54
Electricity Fees $166,982 - $ -
Natural Gas $417,515 118,023 MMBtu $3.54
TOTAL ENERGY COSTS $2,954,584
RECOMMENDED SAVINGS* $57,918 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$16,984
Cost:
$11,275
$12,647 252,934 $4,337 346 - - $12,647
252,934
kWh
$4,337
346
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,515
Cost:
-
- - - - $12,515 3,537 -
-
kWh
-
-
kW-months/year
$12,515
3,537
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$12,508
Cost:
-
- - - - $12,508 3,535 -
-
kWh
-
-
kW-months/year
$12,508
3,535
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,685
Cost:
$1,659
$9,241 184,826 $2,444 195 - - $9,241
184,826
kWh
$2,444
195
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,267
Cost:
$2,345
$1,687 33,748 $579 46 - - $1,687
33,748
kWh
$579
46
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,959
Cost:
$3,900
$1,458 29,162 $501 40 - - $1,458
29,162
kWh
$501
40
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$57,918
Cost:
$19,179
$25,034 500,670 $7,861 627 $25,023 7,072 $25,034
500,670
kWh
$7,861
627
kW-months/year
$25,023
7,072
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu