IAC Assessment: WM0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2025
Principal Product Investment castings
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 1,100,000 Pounds
Production Hrs. Annual 4,160
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,098 2,566,536 kWh $0.05
Electricity Demand $153,096 11,840 kW-months/year $12.93
Electricity Fees $60,199 - $ -
Natural Gas $128,292 18,492 MMBtu $6.94
TOTAL ENERGY COSTS $480,685
RECOMMENDED SAVINGS* $20,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,320
Cost:
$3,350
$2,361 43,726 $6,959 538 - - $2,361
43,726
kWh
$6,959
538
kW-months/year
-
-
MMBtu
02: 2.1224 REPLACE BOILER Savings:
$6,383
Cost:
$56,908
- - - - $6,383 920 -
-
kWh
-
-
kW-months/year
$6,383
920
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,168
Cost:
$1,487
$1,633 30,237 $536 41 - - $1,633
30,237
kWh
$536
41
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,999
Cost:
-
$1,505 27,879 $494 38 - - $1,505
27,879
kWh
$494
38
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$894
Cost:
$349
$584 10,810 $310 24 - - $584
10,810
kWh
$310
24
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,764
Cost:
$62,094
$6,083 112,652 $8,298 642 $6,383 920 $6,083
112,652
kWh
$8,298
642
kW-months/year
$6,383
920
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas