IAC logo
IAC Assessment: WM0240
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WM0240
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2025
Principal Product Tire Shred
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 2,500
Annual Production 60,000 Tons
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,080 6,225,948 kWh $0.04
Electricity Demand $154,584 19,003 kW-months/year $8.13
Electricity Fees $338,502 - $ -
Natural Gas $9,106 873 MMBtu $10.43
TOTAL ENERGY COSTS $741,272
RECOMMENDED SAVINGS* $26,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,534
Cost:
$48,125
- - $17,534 2,155 - - -
-
kWh
$17,534
2,155
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,119
Cost:
$3,235
- - - - $3,119 299 -
-
kWh
-
-
kW-months/year
$3,119
299
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,951
Cost:
$2,250
$1,509 39,700 $443 54 - - $1,509
39,700
kWh
$443
54
kW-months/year
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,825
Cost:
-
- - - - $1,825 175 -
-
kWh
-
-
kW-months/year
$1,825
175
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,748
Cost:
-
$1,238 32,585 $510 63 - - $1,238
32,585
kWh
$510
63
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$26,178
Cost:
$53,610
$2,747 72,285 $18,486 2,272 $4,944 474 $2,747
72,285
kWh
$18,486
2,272
kW-months/year
$4,944
474
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas