Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1995 |
Principal Product | Deep drawn Metal Stampings |
NAICS | n/a |
SIC | 3469 - Metal Stampings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 20,000 Tons |
Production Hrs. Annual | 6,120 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $285,494 | 6,599,941 | kWh | $0.04 |
Natural Gas | $85,198 | 25,971 | MMBtu | $3.28 |
TOTAL ENERGY COSTS | $620,107 | |||
RECOMMENDED SAVINGS* | $127,343 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $9,303 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,069 Cost: $7,326 |
- | - | $2,069 | 631 | - | - | - | - |
- - kWh |
$2,069 631 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,678 Cost: $250 |
$2,678 | 101,407 | - | - | - | - | - | - |
$2,678 101,407 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,010 Cost: $800 |
- | - | $1,010 | 308 | - | - | - | - |
- - kWh |
$1,010 308 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,481 Cost: $1,482 |
$4,481 | 169,695 | - | - | - | - | - | - |
$4,481 169,695 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $2,144 Cost: - |
$2,144 | 81,184 | - | - | - | - | - | - |
$2,144 81,184 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,014 Cost: $800 |
- | - | $1,014 | 309 | - | - | - | - |
- - kWh |
$1,014 309 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,331 Cost: $2,659 |
- | - | $1,331 | 172 | - | - | - | - |
- - kWh |
$1,331 172 MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM |
Savings: $30,701 Cost: $60,000 |
- | - | - | - | $30,701 | 31,000 | - | - |
- - kWh |
- - MMBtu |
$30,701 31,000 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $66,455 Cost: $6,100 |
- | - | - | - | $66,455 | 12,590 | - | - |
- - kWh |
- - MMBtu |
$66,455 12,590 gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.1162 USE LESS WASTEFUL PACKAGING |
Savings: $9,764 Cost: - |
- | - | - | - | - | - | $9,764 | 224,000 |
- - kWh |
- - MMBtu |
- - gal |
$9,764 224,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1162 USE LESS WASTEFUL PACKAGING |
Savings: $5,696 Cost: - |
- | - | - | - | - | - | $5,696 | 132,000 |
- - kWh |
- - MMBtu |
- - gal |
$5,696 132,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $127,343 Cost: $79,417 |
$9,303 | 352,286 | $5,424 | 1,420 | $97,156 | 43,590 | $15,460 | 356,000 | $9,303 352,286 kWh |
$5,424 1,420 MMBtu |
$97,156 43,590 gal |
$15,460 356,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $9,303 Cost: $1,732 |
$9,303 | 352,286 | - | - | - | - | - | - | $9,303 352,286 kWh |
- - MMBtu |
- - gal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) |