Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1997 |
Principal Product | Vinyl and Aluminum Doors and Windows |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 66,240 |
Annual Production | 92,000 Pieces |
Production Hrs. Annual | 2,385 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $72,768 | 757,034 | kWh | $0.10 |
Natural Gas | $41,228 | 10,221 | MMBtu | $4.03 |
TOTAL ENERGY COSTS | $117,324 | |||
RECOMMENDED SAVINGS* | $30,075 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,567 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $535 Cost: $610 |
$535 | 5,569 | - | - | - | - | - | - | - | - |
$535 5,569 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,026 Cost: $200 |
$2,026 | 21,102 | - | - | - | - | - | - | - | - |
$2,026 21,102 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $368 Cost: $755 |
- | - | $368 | 92 | - | - | - | - | - | - |
- - kWh |
$368 92 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $890 Cost: $1,440 |
- | - | $890 | 223 | - | - | - | - | - | - |
- - kWh |
$890 223 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,763 Cost: $10,400 |
$(-224) | (-2,345) | $2,987 | 741 | - | - | - | - | - | - |
$(-224) (-2,345) kWh |
$2,987 741 MMBtu |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $2,250 Cost: $4,720 |
$(-86) | (-879) | - | - | $2,996 | 772,740 | $(-540) | - | $(-120) | - |
$(-86) (-879) kWh |
- - MMBtu |
$2,996 772,740 Tgal |
$(-540) - $ |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $2,043 Cost: $2,000 |
- | - | $1,168 | 292 | $875 | 225,773 | - | - | - | - |
- - kWh |
$1,168 292 MMBtu |
$875 225,773 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $19,200 Cost: $1,700 |
- | - | - | - | - | - | $19,200 | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$19,200 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,075 Cost: $21,825 |
$2,251 | 23,447 | $5,413 | 1,348 | $3,871 | 998,513 | $18,660 | - | $(-120) | - | $2,251 23,447 kWh |
$5,413 1,348 MMBtu |
$3,871 998,513 Tgal |
$18,660 - $ |
$(-120) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,567 Cost: $14,910 |
$2,337 | 24,326 | $4,155 | 1,033 | $875 | 225,773 | $19,200 | - | - | - | $2,337 24,326 kWh |
$4,155 1,033 MMBtu |
$875 225,773 Tgal |
$19,200 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |