IAC logo
IAC Assessment: WV0118
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0118
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Vinyl and Aluminum Doors and Windows
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 66,240
Annual Production 92,000 Pieces
Production Hrs. Annual 2,385
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,768 757,034 kWh $0.10
Natural Gas $41,228 10,221 MMBtu $4.03
TOTAL ENERGY COSTS $117,324
RECOMMENDED SAVINGS* $30,075 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,567
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$535
Cost:
$610
$535 5,569 - - - - - - - - $535
5,569
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,026
Cost:
$200
$2,026 21,102 - - - - - - - - $2,026
21,102
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$368
Cost:
$755
- - $368 92 - - - - - - -
-
kWh
$368
92
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$890
Cost:
$1,440
- - $890 223 - - - - - - -
-
kWh
$890
223
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,763
Cost:
$10,400
$(-224) (-2,345) $2,987 741 - - - - - - $(-224)
(-2,345)
kWh
$2,987
741
MMBtu
-
-
Tgal
-
-
$
-
-
$
06: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$2,250
Cost:
$4,720
$(-86) (-879) - - $2,996 772,740 $(-540) - $(-120) - $(-86)
(-879)
kWh
-
-
MMBtu
$2,996
772,740
Tgal
$(-540)
-
$
$(-120)
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$2,043
Cost:
$2,000
- - $1,168 292 $875 225,773 - - - - -
-
kWh
$1,168
292
MMBtu
$875
225,773
Tgal
-
-
$
-
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$19,200
Cost:
$1,700
- - - - - - $19,200 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$19,200
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,075
Cost:
$21,825
$2,251 23,447 $5,413 1,348 $3,871 998,513 $18,660 - $(-120) - $2,251
23,447
kWh
$5,413
1,348
MMBtu
$3,871
998,513
Tgal
$18,660
-
$
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$26,567
Cost:
$14,910
$2,337 24,326 $4,155 1,033 $875 225,773 $19,200 - - - $2,337
24,326
kWh
$4,155
1,033
MMBtu
$875
225,773
Tgal
$19,200
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $ $ $
Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Water Disposal Personnel Changes Ancillary Material Cost