IAC logo
IAC Assessment: WV0128
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0128
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1997
Principal Product Jumper and Fuel Lines for Automobiles
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 301
Plant Area (Sq.Ft.) 165,000
Annual Production 5,400,000 Pieces
Production Hrs. Annual 6,120
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $272,859 5,379,836 kWh $0.05
Natural Gas $98,491 24,464 MMBtu $4.03
TOTAL ENERGY COSTS $380,742
RECOMMENDED SAVINGS* $224,702 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Primary Product Electricity Usage Natural Gas Water Disposal Primary Product
$ kWh $ MMBtu $ Tgal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$892
Cost:
$150
$892 17,585 - - - - - - $892
17,585
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$3,725
Cost:
$550
$3,725 73,271 - - - - - - $3,725
73,271
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,800
Cost:
$4,700
- - $2,800 694 - - - - -
-
kWh
$2,800
694
MMBtu
-
-
Tgal
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$9,736
Cost:
$713
- - $9,736 2,416 - - - - -
-
kWh
$9,736
2,416
MMBtu
-
-
Tgal
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$109
Cost:
$33
- - $109 27 - - - - -
-
kWh
$109
27
MMBtu
-
-
Tgal
-
-
$
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$2,400
Cost:
$6,300
- - - - $2,400 546,000 - - -
-
kWh
-
-
MMBtu
$2,400
546,000
Tgal
-
-
$
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$2,540
Cost:
$9,300
- - - - $2,540 12,000 - - -
-
kWh
-
-
MMBtu
$2,540
12,000
Tgal
-
-
$
08: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$202,500
Cost:
$250,000
- - - - - - $202,500 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$202,500
-
$
TOTAL RECOMMENDED Savings:
$224,702
Cost:
$271,746
$4,617 90,856 $12,645 3,137 $4,940 558,000 $202,500 - $4,617
90,856
kWh
$12,645
3,137
MMBtu
$4,940
558,000
Tgal
$202,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Primary Product Electricity Usage Natural Gas Water Disposal Primary Product