Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1998
Principal Product Marbles & hand blown glass
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $1,000,000-$5,000,000
# of Employees 150
Plant Area (Sq.Ft.) 250,000
Annual Production 4,912 Tons
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,709 541,618 kWh $0.06
Natural Gas $341,325 97,703 MMBtu $3.49
TOTAL ENERGY COSTS $374,034
RECOMMENDED SAVINGS* $214,521 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,954
#|Description Savings
Cost
Status Natural Gas Solid Waste (non-haz) Administrative Changes Natural Gas Solid Waste (non-haz) Administrative Changes
$ MMBtu $ lb $ $
01: 2.2514 COVER OPEN TANKS Savings:
$38,890
Cost:
$16,000
$38,890 11,143 - - - - $38,890
11,143
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$186
Cost:
$80
$186 54 - - - - $186
54
MMBtu
-
-
lb
-
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$5,769
Cost:
$825
$5,769 1,653 - - - - $5,769
1,653
MMBtu
-
-
lb
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$47,874
Cost:
-
- - - - $47,874 - -
-
MMBtu
-
-
lb
$47,874
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,177
Cost:
$11,000
- - $3,177 - - - -
-
MMBtu
$3,177
-
lb
-
-
$
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$9,125
Cost:
$150
- - - - $9,125 - -
-
MMBtu
-
-
lb
$9,125
-
$
07: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$109,500
Cost:
$16,500
- - - - $109,500 - -
-
MMBtu
-
-
lb
$109,500
-
$
TOTAL RECOMMENDED Savings:
$214,521
Cost:
$44,555
$44,845 12,850 $3,177 - $166,499 - $44,845
12,850
MMBtu
$3,177
-
lb
$166,499
-
$
TOTAL IMPLEMENTED Savings:
$62,954
Cost:
$1,055
$5,955 1,707 - - $56,999 - $5,955
1,707
MMBtu
-
-
lb
$56,999
-
$
Savings
Cost
$ MMBtu $ lb $ $
Natural Gas Solid Waste (non-haz) Administrative Changes Natural Gas Solid Waste (non-haz) Administrative Changes