IAC Assessment: WV0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Centrfiugal pump parts
NAICS n/a
SIC 3561 - Pumps And Pumping Equipment
Sales $10,000,000-$50,000,000
# of Employees 109
Plant Area (Sq.Ft.) 58,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,362 2,138,335 kWh $0.06
Natural Gas $30,854 5,082 MMBtu $6.07
TOTAL ENERGY COSTS $162,216
RECOMMENDED SAVINGS* $62,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,014
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ lb $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,495
Cost:
$265
- - $2,495 411 - - - - -
-
kWh
$2,495
411
MMBtu
-
-
lb
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$847
Cost:
$180
$847 13,775 - - - - - - $847
13,775
kWh
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,864
Cost:
$600
$2,864 46,600 - - - - - - $2,864
46,600
kWh
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,084
Cost:
$98
- - $2,084 115 - - - - -
-
kWh
$2,084
115
MMBtu
-
-
lb
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,095
Cost:
$4,400
- - $5,095 863 - - - - -
-
kWh
$5,095
863
MMBtu
-
-
lb
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,114
Cost:
$300
$7,114 115,768 - - - - - - $7,114
115,768
kWh
-
-
MMBtu
-
-
lb
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$486
Cost:
$450
$486 7,913 - - - - - - $486
7,913
kWh
-
-
MMBtu
-
-
lb
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$750
Cost:
$40
$750 12,016 - - - - - - $750
12,016
kWh
-
-
MMBtu
-
-
lb
-
-
$
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,644
Cost:
$11,000
- - - - $2,644 2,109 - - -
-
kWh
-
-
MMBtu
$2,644
2,109
lb
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$576
Cost:
$42
- - - - $576 - - - -
-
kWh
-
-
MMBtu
$576
-
lb
-
-
$
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$16,640
Cost:
$720
- - - - - - $16,640 - -
-
kWh
-
-
MMBtu
-
-
lb
$16,640
-
$
12: 4.812 APPLY FOR INVESTMENT INCENTIVES Savings:
$21,376
Cost:
-
- - - - - - $21,376 - -
-
kWh
-
-
MMBtu
-
-
lb
$21,376
-
$
TOTAL RECOMMENDED Savings:
$62,971
Cost:
$18,095
$12,061 196,072 $9,674 1,389 $3,220 2,109 $38,016 - $12,061
196,072
kWh
$9,674
1,389
MMBtu
$3,220
2,109
lb
$38,016
-
$
TOTAL IMPLEMENTED Savings:
$34,014
Cost:
$1,040
$9,978 162,368 $2,084 115 $576 - $21,376 - $9,978
162,368
kWh
$2,084
115
MMBtu
$576
-
lb
$21,376
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes