Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 1999 |
Principal Product | Centrfiugal pump parts |
NAICS | n/a |
SIC | 3561 - Pumps And Pumping Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 109 |
Plant Area (Sq.Ft.) | 58,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 8,736 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $131,362 | 2,138,335 | kWh | $0.06 |
Natural Gas | $30,854 | 5,082 | MMBtu | $6.07 |
TOTAL ENERGY COSTS | $162,216 | |||
RECOMMENDED SAVINGS* | $62,971 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,014 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,495 Cost: $265 |
- | - | $2,495 | 411 | - | - | - | - |
- - kWh |
$2,495 411 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $847 Cost: $180 |
$847 | 13,775 | - | - | - | - | - | - |
$847 13,775 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,864 Cost: $600 |
$2,864 | 46,600 | - | - | - | - | - | - |
$2,864 46,600 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,084 Cost: $98 |
- | - | $2,084 | 115 | - | - | - | - |
- - kWh |
$2,084 115 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $5,095 Cost: $4,400 |
- | - | $5,095 | 863 | - | - | - | - |
- - kWh |
$5,095 863 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $7,114 Cost: $300 |
$7,114 | 115,768 | - | - | - | - | - | - |
$7,114 115,768 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $486 Cost: $450 |
$486 | 7,913 | - | - | - | - | - | - |
$486 7,913 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $750 Cost: $40 |
$750 | 12,016 | - | - | - | - | - | - |
$750 12,016 kWh |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $2,644 Cost: $11,000 |
- | - | - | - | $2,644 | 2,109 | - | - |
- - kWh |
- - MMBtu |
$2,644 2,109 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $576 Cost: $42 |
- | - | - | - | $576 | - | - | - |
- - kWh |
- - MMBtu |
$576 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $16,640 Cost: $720 |
- | - | - | - | - | - | $16,640 | - |
- - kWh |
- - MMBtu |
- - lb |
$16,640 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.812 APPLY FOR INVESTMENT INCENTIVES |
Savings: $21,376 Cost: - |
- | - | - | - | - | - | $21,376 | - |
- - kWh |
- - MMBtu |
- - lb |
$21,376 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,971 Cost: $18,095 |
$12,061 | 196,072 | $9,674 | 1,389 | $3,220 | 2,109 | $38,016 | - | $12,061 196,072 kWh |
$9,674 1,389 MMBtu |
$3,220 2,109 lb |
$38,016 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,014 Cost: $1,040 |
$9,978 | 162,368 | $2,084 | 115 | $576 | - | $21,376 | - | $9,978 162,368 kWh |
$2,084 115 MMBtu |
$576 - lb |
$21,376 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes |