IAC logo
IAC Assessment: WV0175
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0175
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 1999
Principal Product Rubber chemicals
NAICS n/a
SIC 3229 - Pressed And Blown Glass, Nec
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 1,829,520
Annual Production 73,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,194,450 35,592,615 kWh $0.03
Natural Gas $287,311 79,529 MMBtu $3.61
Coal $970,042 507,862 MMBtu $1.91
TOTAL ENERGY COSTS $2,451,803
RECOMMENDED SAVINGS* $720,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $457,889
#|Description Savings
Cost
Status Electricity Usage Coal Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Coal Water Disposal Solid Waste (non-haz) Personnel Changes
$ kWh $ MMBtu $ Tgal $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$177
Cost:
$200
$177 5,275 - - - - - - - - $177
5,275
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$332
Cost:
$204
$332 9,965 - - - - - - - - $332
9,965
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$426,829
Cost:
$88,360
- - $426,829 223,466 - - - - - - -
-
kWh
$426,829
223,466
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,700
Cost:
$14,700
$14,700 3,690,504 - - - - - - - - $14,700
3,690,504
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$8,476
Cost:
$884
- - - - - - $8,476 - - - -
-
kWh
-
-
MMBtu
-
-
Tgal
$8,476
-
lb
-
-
$
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$7,884
Cost:
-
- - - - $7,884 - - - - - -
-
kWh
-
-
MMBtu
$7,884
-
Tgal
-
-
lb
-
-
$
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$262,080
Cost:
-
- - - - - - - - $262,080 - -
-
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
$262,080
-
$
TOTAL RECOMMENDED Savings:
$720,478
Cost:
$104,348
$15,209 3,705,744 $426,829 223,466 $7,884 - $8,476 - $262,080 - $15,209
3,705,744
kWh
$426,829
223,466
MMBtu
$7,884
-
Tgal
$8,476
-
lb
$262,080
-
$
TOTAL IMPLEMENTED Savings:
$457,889
Cost:
$103,944
$14,700 3,690,504 $426,829 223,466 $7,884 - $8,476 - - - $14,700
3,690,504
kWh
$426,829
223,466
MMBtu
$7,884
-
Tgal
$8,476
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb $ $
Electricity Usage Coal Water Disposal Solid Waste (non-haz) Personnel Changes Electricity Usage Coal Water Disposal Solid Waste (non-haz) Personnel Changes