Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2000 |
Principal Product | Cap & T-shirt printing and embroidery |
NAICS | n/a |
SIC | 2395 - Pleating And Stitching |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 7,176 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $48,097 | 862,544 | kWh | $0.06 |
Natural Gas | $11,845 | 3,039 | MMBtu | $3.90 |
TOTAL ENERGY COSTS | $59,942 | |||
RECOMMENDED SAVINGS* | $104,445 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $98,430 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,108 Cost: $233 |
$2,108 | 37,808 | - | - | - | - | - | - | - | - |
$2,108 37,808 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $1,405 Cost: - |
- | - | $1,405 | 86 | - | - | - | - | - | - |
- - kWh |
$1,405 86 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $2,260 Cost: - |
- | - | $2,260 | 487 | - | - | - | - | - | - |
- - kWh |
$2,260 487 MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,907 Cost: $416 |
$3,907 | 70,047 | - | - | - | - | - | - | - | - |
$3,907 70,047 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,275 Cost: $80 |
$1,275 | 22,860 | - | - | - | - | - | - | - | - |
$1,275 22,860 kWh |
- - MMBtu |
- - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $120 Cost: $60 |
- | - | - | - | $120 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$120 - lb |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5211 REUSE SCRAP GLASS AS FEED STOCK |
Savings: $82 Cost: - |
- | - | - | - | - | - | $82 | - | - | - |
- - kWh |
- - MMBtu |
- - lb |
$82 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $93,288 Cost: - |
- | - | - | - | - | - | - | - | $93,288 | - |
- - kWh |
- - MMBtu |
- - lb |
- - lb |
$93,288 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $104,445 Cost: $789 |
$7,290 | 130,715 | $3,665 | 573 | $120 | - | $82 | - | $93,288 | - | $7,290 130,715 kWh |
$3,665 573 MMBtu |
$120 - lb |
$82 - lb |
$93,288 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $98,430 Cost: $140 |
$1,275 | 22,860 | $3,665 | 573 | $120 | - | $82 | - | $93,288 | - | $1,275 22,860 kWh |
$3,665 573 MMBtu |
$120 - lb |
$82 - lb |
$93,288 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Solid Waste (haz) | Personnel Changes |