IAC Assessment: WV0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Commercial China Ware
NAICS n/a
SIC 3262 - Vitreous China Table & Kitchenware
Sales $1,000,000-$5,000,000
# of Employees 63
Plant Area (Sq.Ft.) 80,000
Annual Production 1,500,000 Pieces
Production Hrs. Annual 2,080
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,868 1,417,910 kWh $0.10
Electricity Demand $46,430 3,610 kW-months/year $12.86
Natural Gas $108,727 11,261 MMBtu $9.66
TOTAL ENERGY COSTS $290,025
RECOMMENDED SAVINGS* $88,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,709
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,955
Cost:
$540
$461 12,599 $1,494 83 - - - - - - - - $461
12,599
kWh
$1,494
83
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$6,260
Cost:
$2,160
- - - - $6,260 648 - - - - - - -
-
kWh
-
-
kW-months/year
$6,260
648
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,287
Cost:
$145
- - - - $1,287 133 - - - - - - -
-
kWh
-
-
kW-months/year
$1,287
133
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,007
Cost:
$500
- - - - $1,007 104 - - - - - - -
-
kWh
-
-
kW-months/year
$1,007
104
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,806
Cost:
$480
$467 12,892 $1,339 74 - - - - - - - - $467
12,892
kWh
$1,339
74
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,940
Cost:
$1,885
- - - - $9,940 1,029 - - - - - - -
-
kWh
-
-
kW-months/year
$9,940
1,029
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.1224 REPLACE BOILER Savings:
$17,262
Cost:
$9,690
- - - - $17,262 1,787 - - - - - - -
-
kWh
-
-
kW-months/year
$17,262
1,787
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,438
Cost:
$3,538
- - - - $7,438 770 - - - - - - -
-
kWh
-
-
kW-months/year
$7,438
770
MMBtu
-
-
Tgal
-
-
lb
-
-
$
09: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$4,019
Cost:
$5,330
- - - - $4,019 416 - - - - - - -
-
kWh
-
-
kW-months/year
$4,019
416
MMBtu
-
-
Tgal
-
-
lb
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$480
Cost:
$100
- - - - - - - - $480 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$480
-
lb
-
-
$
11: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$20,054
Cost:
$1,307
- - - - - - $20,054 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$20,054
-
Tgal
-
-
lb
-
-
$
12: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$16,848
Cost:
$750
- - - - - - - - - - $16,848 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$16,848
-
$
TOTAL RECOMMENDED Savings:
$88,356
Cost:
$26,425
$928 25,491 $2,833 157 $47,213 4,887 $20,054 - $480 - $16,848 - $928
25,491
kWh
$2,833
157
kW-months/year
$47,213
4,887
MMBtu
$20,054
-
Tgal
$480
-
lb
$16,848
-
$
TOTAL IMPLEMENTED Savings:
$52,709
Cost:
$10,812
$928 25,491 $2,833 157 $11,566 1,197 $20,054 - $480 - $16,848 - $928
25,491
kWh
$2,833
157
kW-months/year
$11,566
1,197
MMBtu
$20,054
-
Tgal
$480
-
lb
$16,848
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes