Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2001 |
Principal Product | Commercial China Ware |
NAICS | n/a |
SIC | 3262 - Vitreous China Table & Kitchenware |
Sales | $1,000,000-$5,000,000 |
# of Employees | 63 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 1,500,000 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $134,868 | 1,417,910 | kWh | $0.10 |
Electricity Demand | $46,430 | 3,610 | kW-months/year | $12.86 |
Natural Gas | $108,727 | 11,261 | MMBtu | $9.66 |
TOTAL ENERGY COSTS | $290,025 | |||
RECOMMENDED SAVINGS* | $88,356 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,709 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,955 Cost: $540 |
$461 | 12,599 | $1,494 | 83 | - | - | - | - | - | - | - | - |
$461 12,599 kWh |
$1,494 83 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $6,260 Cost: $2,160 |
- | - | - | - | $6,260 | 648 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,260 648 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,287 Cost: $145 |
- | - | - | - | $1,287 | 133 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,287 133 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,007 Cost: $500 |
- | - | - | - | $1,007 | 104 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,007 104 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $1,806 Cost: $480 |
$467 | 12,892 | $1,339 | 74 | - | - | - | - | - | - | - | - |
$467 12,892 kWh |
$1,339 74 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $9,940 Cost: $1,885 |
- | - | - | - | $9,940 | 1,029 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,940 1,029 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1224 REPLACE BOILER |
Savings: $17,262 Cost: $9,690 |
- | - | - | - | $17,262 | 1,787 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,262 1,787 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,438 Cost: $3,538 |
- | - | - | - | $7,438 | 770 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,438 770 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $4,019 Cost: $5,330 |
- | - | - | - | $4,019 | 416 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,019 416 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $480 Cost: $100 |
- | - | - | - | - | - | - | - | $480 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$480 - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $20,054 Cost: $1,307 |
- | - | - | - | - | - | $20,054 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$20,054 - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $16,848 Cost: $750 |
- | - | - | - | - | - | - | - | - | - | $16,848 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$16,848 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,356 Cost: $26,425 |
$928 | 25,491 | $2,833 | 157 | $47,213 | 4,887 | $20,054 | - | $480 | - | $16,848 | - | $928 25,491 kWh |
$2,833 157 kW-months/year |
$47,213 4,887 MMBtu |
$20,054 - Tgal |
$480 - lb |
$16,848 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,709 Cost: $10,812 |
$928 | 25,491 | $2,833 | 157 | $11,566 | 1,197 | $20,054 | - | $480 | - | $16,848 | - | $928 25,491 kWh |
$2,833 157 kW-months/year |
$11,566 1,197 MMBtu |
$20,054 - Tgal |
$480 - lb |
$16,848 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Administrative Changes |