IAC Assessment: WV0214
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0214
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Rough Lumber
NAICS n/a
SIC 3531 - Construction Machinery
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 23,150
Annual Production 20,000 Thousand Feet
Production Hrs. Annual 4,590
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,605 3,962,400 kWh $0.03
Electricity Demand $84,793 794 kW-months/year $106.79
Wood $28,688 67,664 MMBtu $0.42
TOTAL ENERGY COSTS $224,086
RECOMMENDED SAVINGS* $124,051 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,592
#|Description Savings
Cost
Status Electricity Usage Wood Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Wood Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,402
Cost:
$40
$2,402 50,103 - - - - - - - - $2,402
50,103
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,680
Cost:
$2,680
- - $1,680 1,042 - - - - - - -
-
kWh
$1,680
1,042
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$555
Cost:
$588
- - $555 1,309 - - - - - - -
-
kWh
$555
1,309
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$52,028
Cost:
$185,000
$52,028 2,147,104 - - - - - - - - $52,028
2,147,104
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$659
Cost:
$150
$659 17,287 - - - - - - - - $659
17,287
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$7,955
Cost:
$1,500
$7,955 170,819 - - - - - - - - $7,955
170,819
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$35,000
Cost:
$1,500
- - - - - - $35,000 - - - -
-
kWh
-
-
MMBtu
-
-
gal
$35,000
-
lb
-
-
$
08: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$3,772
Cost:
$5,000
- - - - $3,772 - - - - - -
-
kWh
-
-
MMBtu
$3,772
-
gal
-
-
lb
-
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$20,000
Cost:
$7,000
- - - - - - - - $20,000 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$20,000
-
$
TOTAL RECOMMENDED Savings:
$124,051
Cost:
$203,458
$63,044 2,385,313 $2,235 2,351 $3,772 - $35,000 - $20,000 - $63,044
2,385,313
kWh
$2,235
2,351
MMBtu
$3,772
-
gal
$35,000
-
lb
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$32,592
Cost:
$11,808
$10,357 220,922 $2,235 2,351 - - - - $20,000 - $10,357
220,922
kWh
$2,235
2,351
MMBtu
-
-
gal
-
-
lb
$20,000
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Wood Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Wood Other Liquid (haz) Solid Waste (non-haz) Administrative Changes