IAC logo
IAC Assessment: WV0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Asphalt
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 7
Plant Area (Sq.Ft.) 108,900
Annual Production 252,000 Tons
Production Hrs. Annual 3,840
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $21,063 545,920 kWh $0.04
Electricity Demand $56,771 450 kW-months/year $126.16
Natural Gas $333,276 58,494 MMBtu $5.70
TOTAL ENERGY COSTS $411,110
RECOMMENDED SAVINGS* $129,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,863
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$167
Cost:
$136
- - - - $167 29 - - - - -
-
kWh
-
-
kW-months/year
$167
29
MMBtu
-
-
gal
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,605
Cost:
$175,000
$9,223 239,088 $13,382 62 - - - - - - $9,223
239,088
kWh
$13,382
62
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$14,413
Cost:
$1,000
- - - - $14,413 2,529 - - - - -
-
kWh
-
-
kW-months/year
$14,413
2,529
MMBtu
-
-
gal
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,970
Cost:
$4,460
- - - - $11,970 2,100 - - - - -
-
kWh
-
-
kW-months/year
$11,970
2,100
MMBtu
-
-
gal
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$15,557
Cost:
$1,500
$6,321 163,787 $9,236 43 - - - - - - $6,321
163,787
kWh
$9,236
43
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$99
Cost:
$80
$45 1,172 $54 4 - - - - - - $45
1,172
kWh
$54
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,354
Cost:
$75
$645 16,701 $709 53 - - - - - - $645
16,701
kWh
$709
53
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
08: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$55,440
Cost:
$10,000
- - - - - - $55,440 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$55,440
-
gal
-
-
$
09: 4.232 LEASE EQUIPMENT INSTEAD OF PURCHASING Savings:
$2,250
Cost:
$200
- - - - - - - - $2,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,250
-
$
10: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$6,000
Cost:
$500
- - - - - - - - $6,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$6,000
-
$
TOTAL RECOMMENDED Savings:
$129,855
Cost:
$192,951
$16,234 420,748 $23,381 162 $26,550 4,658 $55,440 - $8,250 - $16,234
420,748
kWh
$23,381
162
kW-months/year
$26,550
4,658
MMBtu
$55,440
-
gal
$8,250
-
$
TOTAL IMPLEMENTED Savings:
$86,863
Cost:
$12,655
$7,011 181,660 $9,999 100 $14,413 2,529 $55,440 - - - $7,011
181,660
kWh
$9,999
100
kW-months/year
$14,413
2,529
MMBtu
$55,440
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes