IAC Assessment: WV0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2001
Principal Product Forged components for valves and fittings
NAICS n/a
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 31,000
Annual Production 25,500,000 Pounds
Production Hrs. Annual 4,208
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $224,358 5,250,600 kWh $0.04
Electricity Demand $226,886 22,651 kW-months/year $10.02
Natural Gas $8,077 731 MMBtu $11.05
TOTAL ENERGY COSTS $459,321
RECOMMENDED SAVINGS* $349,244 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,844
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,194
Cost:
$1,000
$679 17,287 $515 515 - - - - - - - - $679
17,287
kWh
$515
515
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,692
Cost:
$300
$2,059 52,740 $2,633 2,633 - - - - - - - - $2,059
52,740
kWh
$2,633
2,633
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,270
Cost:
$124
$1,853 47,466 $1,417 1,417 - - - - - - - - $1,853
47,466
kWh
$1,417
1,417
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,630
Cost:
$386
- - - - $6,630 600 - - - - - - -
-
kWh
-
-
kW-months/year
$6,630
600
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$7,635
Cost:
$1,344
$4,480 114,856 $3,424 3,424 - - - - $(-269) - - - $4,480
114,856
kWh
$3,424
3,424
kW-months/year
-
-
MMBtu
-
-
lb
$(-269)
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,567
Cost:
$44
$2,025 51,861 $1,542 1,542 - - - - - - - - $2,025
51,861
kWh
$1,542
1,542
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$13,680
Cost:
$220
- - - - - - $13,680 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$13,680
-
lb
-
-
$
-
-
$
08: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$92,576
Cost:
$12,000
- - - - - - - - - - $92,576 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$92,576
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$216,000
Cost:
$400,000
- - - - - - - - - - $216,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$216,000
-
$
TOTAL RECOMMENDED Savings:
$349,244
Cost:
$415,418
$11,096 284,210 $9,531 9,531 $6,630 600 $13,680 - $(-269) - $308,576 - $11,096
284,210
kWh
$9,531
9,531
kW-months/year
$6,630
600
MMBtu
$13,680
-
lb
$(-269)
-
$
$308,576
-
$
TOTAL IMPLEMENTED Savings:
$32,844
Cost:
$2,032
$10,417 266,923 $9,016 9,016 - - $13,680 - $(-269) - - - $10,417
266,923
kWh
$9,016
9,016
kW-months/year
-
-
MMBtu
$13,680
-
lb
$(-269)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes