Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2001 |
Principal Product | Telescoping light products, bank deposit drawers and securit |
NAICS | n/a |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 295 |
Plant Area (Sq.Ft.) | 169,000 |
Annual Production | 10,200,000 Pounds |
Production Hrs. Annual | 3,300 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $190,737 | 4,332,405 | kWh | $0.04 |
Electricity Demand | $43,438 | 844 | kW-months/year | $51.47 |
Natural Gas | $46,644 | 12,230 | MMBtu | $3.81 |
TOTAL ENERGY COSTS | $280,819 | |||
RECOMMENDED SAVINGS* | $65,166 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS |
Savings: $720 Cost: $4,100 |
- | - | - | - | $720 | 189 | - | - | - | - |
- - kWh |
- - kW-months/year |
$720 189 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $6,690 Cost: $5,084 |
- | - | - | - | $6,690 | 1,756 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,690 1,756 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $8,134 Cost: $528 |
$6,024 | 136,831 | $2,110 | 41 | - | - | - | - | - | - |
$6,024 136,831 kWh |
$2,110 41 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $4,177 Cost: $1,320 |
$3,096 | 70,320 | $1,081 | 21 | - | - | - | - | - | - |
$3,096 70,320 kWh |
$1,081 21 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $674 Cost: $386 |
- | - | - | - | $674 | 177 | - | - | - | - |
- - kWh |
- - kW-months/year |
$674 177 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $2,187 Cost: $2,058 |
- | - | - | - | $2,187 | 574 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,187 574 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,519 Cost: $1,500 |
$1,122 | 25,491 | $397 | 8 | - | - | - | - | - | - |
$1,122 25,491 kWh |
$397 8 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $453 Cost: $44 |
$335 | 7,618 | $118 | 2 | - | - | - | - | - | - |
$335 7,618 kWh |
$118 2 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $733 Cost: $104 |
$541 | 12,306 | $192 | 4 | - | - | - | - | - | - |
$541 12,306 kWh |
$192 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $683 Cost: $250 |
$400 | 9,083 | $283 | 6 | - | - | - | - | - | - |
$400 9,083 kWh |
$283 6 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $2,221 Cost: $4,450 |
- | - | - | - | $2,221 | 583 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,221 583 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $699 Cost: $2,655 |
- | - | - | - | $699 | 183 | - | - | - | - |
- - kWh |
- - kW-months/year |
$699 183 MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $275 Cost: $1,044 |
- | - | - | - | - | - | $275 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$275 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $1,001 Cost: $2,500 |
- | - | - | - | - | - | $1,001 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,001 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $35,000 Cost: $10,440 |
- | - | - | - | - | - | - | - | $35,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$35,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,166 Cost: $36,463 |
$11,518 | 261,649 | $4,181 | 82 | $13,191 | 3,462 | $1,276 | - | $35,000 | - | $11,518 261,649 kWh |
$4,181 82 kW-months/year |
$13,191 3,462 MMBtu |
$1,276 - gal |
$35,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,130 Cost: $6,176 |
$10,396 | 236,158 | $3,784 | 74 | $674 | 177 | $1,276 | - | - | - | $10,396 236,158 kWh |
$3,784 74 kW-months/year |
$674 177 MMBtu |
$1,276 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Administrative Changes |