IAC logo
IAC Assessment: WV0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2002
Principal Product Printed Steel Sheets
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 24,000
Annual Production 144,000,000 Pieces
Production Hrs. Annual 6,732
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $117,358 2,054,800 kWh $0.06
Electricity Demand $33,648 6,408 kW-months/year $5.25
Natural Gas $335,854 48,713 MMBtu $6.89
TOTAL ENERGY COSTS $486,860
RECOMMENDED SAVINGS* $44,216 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,578
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,157
Cost:
$1,150
$2,526 44,243 $631 10 - - - - - - - - $2,526
44,243
kWh
$631
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,458
Cost:
$60
$1,255 21,975 $203 3 - - - - - - - - $1,255
21,975
kWh
$203
3
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,650
Cost:
$6,000
- - - - $4,650 732 - - - - - - -
-
kWh
-
-
kW-months/year
$4,650
732
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,594
Cost:
$180
$1,371 24,026 $223 4 - - - - - - - - $1,371
24,026
kWh
$223
4
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,871
Cost:
$620
- - - - $1,871 271 - - - - - - -
-
kWh
-
-
kW-months/year
$1,871
271
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,675
Cost:
$2,700
- - - - $1,675 452 - - - - - - -
-
kWh
-
-
kW-months/year
$1,675
452
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$5,097
Cost:
$800
$4,386 76,473 $711 11 - - - - - - - - $4,386
76,473
kWh
$711
11
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$1,848
Cost:
$4,000
- - - - - - $1,848 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,848
-
gal
-
-
lb
-
-
$
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,872
Cost:
$300
- - - - - - - - $3,872 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$3,872
-
lb
-
-
$
10: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$18,994
Cost:
-
- - - - - - - - - - $18,994 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$18,994
-
$
TOTAL RECOMMENDED Savings:
$44,216
Cost:
$15,810
$9,538 166,717 $1,768 28 $8,196 1,455 $1,848 - $3,872 - $18,994 - $9,538
166,717
kWh
$1,768
28
kW-months/year
$8,196
1,455
MMBtu
$1,848
-
gal
$3,872
-
lb
$18,994
-
$
TOTAL IMPLEMENTED Savings:
$32,578
Cost:
$2,310
$8,167 142,691 $1,545 24 - - - - $3,872 - $18,994 - $8,167
142,691
kWh
$1,545
24
kW-months/year
-
-
MMBtu
-
-
gal
$3,872
-
lb
$18,994
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Administrative Changes