IAC Assessment: WV0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2005
Principal Product Specialty Chemicals
NAICS 424690 - Other Chemical and Allied Products Merchant Wholesalers
SIC 5169 - Chemicals & Allied Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 300,000
Annual Production 0 Pounds
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $256,710 12,536,120 kWh $0.02
Electricity Demand $192,164 22,937 kW-months/year $8.38
Electricity Fees $12,519 - $ -
Natural Gas $987,800 144,403 MMBtu $6.84
TOTAL ENERGY COSTS $1,740,640
RECOMMENDED SAVINGS* $233,246 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,430
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$94,235
Cost:
$1,000
- - - - $102,155 14,935 - - $(-7,920) - -
-
kWh
-
-
kW-months/year
$102,155
14,935
MMBtu
-
-
Tgal
$(-7,920)
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$28,522
Cost:
$10,250
- - - - $28,522 4,170 - - - - -
-
kWh
-
-
kW-months/year
$28,522
4,170
MMBtu
-
-
Tgal
-
-
$
03: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$27,626
Cost:
$5,110
- - - - $27,626 4,039 - - - - -
-
kWh
-
-
kW-months/year
$27,626
4,039
MMBtu
-
-
Tgal
-
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$21,789
Cost:
$110
$14,197 661,264 $7,592 906 - - - - - - $14,197
661,264
kWh
$7,592
906
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$15,992
Cost:
$3,200
- - - - $15,992 2,338 - - - - -
-
kWh
-
-
kW-months/year
$15,992
2,338
MMBtu
-
-
Tgal
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$14,331
Cost:
$13,600
- - - - $12,333 1,803 $1,998 540,096 - - -
-
kWh
-
-
kW-months/year
$12,333
1,803
MMBtu
$1,998
540,096
Tgal
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,376
Cost:
$900
$6,108 284,467 $3,268 390 - - - - - - $6,108
284,467
kWh
$3,268
390
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,952
Cost:
$1,322
- - - - $4,952 724 - - - - -
-
kWh
-
-
kW-months/year
$4,952
724
MMBtu
-
-
Tgal
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,756
Cost:
$1,320
$3,307 154,118 $1,769 211 - - - - $(-1,320) - $3,307
154,118
kWh
$1,769
211
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,320)
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,479
Cost:
$110
$2,264 105,845 $1,215 145 - - - - - - $2,264
105,845
kWh
$1,215
145
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,420
Cost:
$1,000
- - - - $3,420 501 - - - - -
-
kWh
-
-
kW-months/year
$3,420
501
MMBtu
-
-
Tgal
-
-
$
12: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,220
Cost:
$620
$1,447 67,390 $773 92 - - - - - - $1,447
67,390
kWh
$773
92
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
13: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$2,101
Cost:
-
$2,541 118,372 $1,358 162 - - - - $(-1,798) - $2,541
118,372
kWh
$1,358
162
kW-months/year
-
-
MMBtu
-
-
Tgal
$(-1,798)
-
$
14: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,447
Cost:
$1,050
$944 44,101 $503 60 - - - - - - $944
44,101
kWh
$503
60
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$233,246
Cost:
$39,592
$30,808 1,435,557 $16,478 1,966 $195,000 28,510 $1,998 540,096 $(-11,038) - $30,808
1,435,557
kWh
$16,478
1,966
kW-months/year
$195,000
28,510
MMBtu
$1,998
540,096
Tgal
$(-11,038)
-
$
TOTAL IMPLEMENTED Savings:
$137,430
Cost:
$9,472
$13,126 611,820 $7,025 838 $126,519 18,498 - - $(-9,240) - $13,126
611,820
kWh
$7,025
838
kW-months/year
$126,519
18,498
MMBtu
-
-
Tgal
$(-9,240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes