IAC logo
IAC Assessment: WV0391
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0391
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2009
Principal Product Precast Concrete
NAICS 238120 - Structural Steel and Precast Concrete Contractors
SIC 3272 - Concrete Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 189,154
Annual Production 93,400 Units
Production Hrs. Annual 5,060
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $135,840 3,256,768 kWh $0.04
Electricity Demand $69,805 8,854 kW-months/year $7.88
Electricity Fees $567 - $ -
Natural Gas $353,514 26,363 MMBtu $13.41
TOTAL ENERGY COSTS $559,726
RECOMMENDED SAVINGS* $79,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,637
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$27,893
Cost:
$26,000
- - - - $27,893 2,080 - - -
-
kWh
-
-
kW-months/year
$27,893
2,080
MMBtu
-
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$11,811
Cost:
$6,850
$8,155 195,518 $3,656 464 - - - - $8,155
195,518
kWh
$3,656
464
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,520
Cost:
$800
- - - - $11,573 863 $(-53) - -
-
kWh
-
-
kW-months/year
$11,573
863
MMBtu
$(-53)
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,238
Cost:
$8,890
$6,378 152,901 $2,860 363 - - - - $6,378
152,901
kWh
$2,860
363
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,896
Cost:
$8,900
$3,383 81,114 $1,513 192 - - - - $3,383
81,114
kWh
$1,513
192
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,483
Cost:
$105
$3,096 74,226 $1,387 176 - - - - $3,096
74,226
kWh
$1,387
176
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,782
Cost:
$8,543
- - - - $3,782 282 - - -
-
kWh
-
-
kW-months/year
$3,782
282
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,651
Cost:
$605
$1,978 47,412 $883 112 - - $(-210) - $1,978
47,412
kWh
$883
112
kW-months/year
-
-
MMBtu
$(-210)
-
$
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$2,609
Cost:
$1,000
$1,898 45,516 $851 108 - - $(-140) - $1,898
45,516
kWh
$851
108
kW-months/year
-
-
MMBtu
$(-140)
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$374
Cost:
$300
$215 5,154 $159 12 - - - - $215
5,154
kWh
$159
12
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$79,257
Cost:
$61,993
$25,103 601,841 $11,309 1,427 $43,248 3,225 $(-403) - $25,103
601,841
kWh
$11,309
1,427
kW-months/year
$43,248
3,225
MMBtu
$(-403)
-
$
TOTAL IMPLEMENTED Savings:
$21,637
Cost:
$2,810
$7,187 172,308 $3,280 408 $11,573 863 $(-403) - $7,187
172,308
kWh
$3,280
408
kW-months/year
$11,573
863
MMBtu
$(-403)
-
$