IAC Assessment: WV0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2010
Principal Product fuel and oil additives
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $100,000,000-$500,000,000
# of Employees 80
Plant Area (Sq.Ft.) 100,000
Annual Production 6,500,000 Units
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $334,145 5,248,800 kWh $0.06
Electricity Demand $67,047 10,346 kW-months/year $6.48
Natural Gas $295,121 26,892 MMBtu $10.97
TOTAL ENERGY COSTS $696,313
RECOMMENDED SAVINGS* $66,029 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,627
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,244
Cost:
$30,500
- - - - $15,244 1,396 - - -
-
kWh
-
-
kW-months/year
$15,244
1,396
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,496
Cost:
$2,500
- - - - $8,616 789 $(-120) - -
-
kWh
-
-
kW-months/year
$8,616
789
MMBtu
$(-120)
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,288
Cost:
$2,374
- - - - $8,288 759 - - -
-
kWh
-
-
kW-months/year
$8,288
759
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,114
Cost:
$22,200
- - - - $8,114 743 - - -
-
kWh
-
-
kW-months/year
$8,114
743
MMBtu
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,111
Cost:
$2,160
$6,243 98,069 $868 134 - - - - $6,243
98,069
kWh
$868
134
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,926
Cost:
$4,530
$4,323 67,913 $603 93 - - - - $4,323
67,913
kWh
$603
93
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,558
Cost:
$1,000
$4,389 68,950 $609 94 - - $(-440) - $4,389
68,950
kWh
$609
94
kW-months/year
-
-
MMBtu
$(-440)
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,797
Cost:
$830
$3,752 58,931 $525 81 - - $(-480) - $3,752
58,931
kWh
$525
81
kW-months/year
-
-
MMBtu
$(-480)
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,776
Cost:
$1,360
$3,316 52,084 $460 71 - - - - $3,316
52,084
kWh
$460
71
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$1,031
Cost:
$938
$895 14,064 $136 21 - - - - $895
14,064
kWh
$136
21
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$688
Cost:
$280
- - - - $688 63 - - -
-
kWh
-
-
kW-months/year
$688
63
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$66,029
Cost:
$68,672
$22,918 360,011 $3,201 494 $40,950 3,750 $(-1,040) - $22,918
360,011
kWh
$3,201
494
kW-months/year
$40,950
3,750
MMBtu
$(-1,040)
-
$
TOTAL IMPLEMENTED Savings:
$20,627
Cost:
$5,690
$11,457 179,965 $1,594 246 $8,616 789 $(-1,040) - $11,457
179,965
kWh
$1,594
246
kW-months/year
$8,616
789
MMBtu
$(-1,040)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes