IAC logo
IAC Assessment: WV0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2011
Principal Product Recycled Rubber Polymers
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 78
Plant Area (Sq.Ft.) 300,000
Annual Production 80,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $393,153 5,685,000 kWh $0.07
Electricity Demand $124,001 15,500 kW-months/year $8.00
Electricity Fees $8,424 - $ -
Natural Gas $106,532 13,788 MMBtu $7.73
TOTAL ENERGY COSTS $632,110
RECOMMENDED SAVINGS* $54,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,000
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,044
Cost:
$18,250
$23,884 386,726 $5,160 645 - - - - $23,884
386,726
kWh
$5,160
645
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7242 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES Savings:
$9,494
Cost:
$17,598
$8,062 130,534 $1,432 179 - - - - $8,062
130,534
kWh
$1,432
179
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,167
Cost:
$1,000
- - - - $4,205 544 $(-38) - -
-
kWh
-
-
kW-months/year
$4,205
544
MMBtu
$(-38)
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$3,049
Cost:
$2,000
$2,673 43,281 $576 72 - - $(-200) - $2,673
43,281
kWh
$576
72
kW-months/year
-
-
MMBtu
$(-200)
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,822
Cost:
$1,150
$2,814 45,559 $608 76 - - $(-600) - $2,814
45,559
kWh
$608
76
kW-months/year
-
-
MMBtu
$(-600)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,969
Cost:
$920
$1,617 26,187 $352 44 - - - - $1,617
26,187
kWh
$352
44
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$1,500
Cost:
$2,875
- - - - $1,500 194 - - -
-
kWh
-
-
kW-months/year
$1,500
194
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,008
Cost:
$50
$832 13,471 $176 22 - - - - $832
13,471
kWh
$176
22
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$954
Cost:
$363
$786 12,730 $168 21 - - - - $786
12,730
kWh
$168
21
kW-months/year
-
-
MMBtu
-
-
$
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$750
Cost:
$329
- - - - $750 97 - - -
-
kWh
-
-
kW-months/year
$750
97
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$54,757
Cost:
$44,535
$40,668 658,488 $8,472 1,059 $6,455 835 $(-838) - $40,668
658,488
kWh
$8,472
1,059
kW-months/year
$6,455
835
MMBtu
$(-838)
-
$
TOTAL IMPLEMENTED Savings:
$12,000
Cost:
$4,563
$7,105 115,041 $1,528 191 $4,205 544 $(-838) - $7,105
115,041
kWh
$1,528
191
kW-months/year
$4,205
544
MMBtu
$(-838)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes