IAC logo
IAC Assessment: WV0424
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0424
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2011
Principal Product Gray Cast Iron
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 68,000
Annual Production 4,830,211 Pounds
Production Hrs. Annual 1,632
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,367 1,840,924 kWh $0.09
Electricity Fees $210 - $ -
Natural Gas $61,968 5,130 MMBtu $12.08
Coal $142,290 8,629 MMBtu $16.49
TOTAL ENERGY COSTS $370,835
RECOMMENDED SAVINGS* $43,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,797
#|Description Savings
Cost
Status Electricity Usage Coal Personnel Changes Increase in Production Electricity Usage Coal Personnel Changes Increase in Production
$ kWh $ MMBtu $ $ $ %
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$28,849
Cost:
$68,420
- - $12,549 761 - - $16,300 - -
-
kWh
$12,549
761
MMBtu
-
-
$
$16,300
-
%
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,755
Cost:
-
$3,755 41,554 - - - - - - $3,755
41,554
kWh
-
-
MMBtu
-
-
$
-
-
%
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,339
Cost:
$48
$2,339 25,888 - - - - - - $2,339
25,888
kWh
-
-
MMBtu
-
-
$
-
-
%
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,845
Cost:
$902
$1,989 22,013 - - $(-144) - - - $1,989
22,013
kWh
-
-
MMBtu
$(-144)
-
$
-
-
%
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,826
Cost:
$1,230
$1,826 20,201 - - - - - - $1,826
20,201
kWh
-
-
MMBtu
-
-
$
-
-
%
06: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,463
Cost:
$1,000
$1,999 22,123 - - $(-536) - - - $1,999
22,123
kWh
-
-
MMBtu
$(-536)
-
$
-
-
%
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,225
Cost:
$3,816
$1,225 13,559 - - - - - - $1,225
13,559
kWh
-
-
MMBtu
-
-
$
-
-
%
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$733
Cost:
$1,600
$733 8,110 - - - - - - $733
8,110
kWh
-
-
MMBtu
-
-
$
-
-
%
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$709
Cost:
$592
$709 7,847 - - - - - - $709
7,847
kWh
-
-
MMBtu
-
-
$
-
-
%
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$653
Cost:
$395
$653 7,231 - - - - - - $653
7,231
kWh
-
-
MMBtu
-
-
$
-
-
%
11: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$395
Cost:
$360
$395 4,371 - - - - - - $395
4,371
kWh
-
-
MMBtu
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$43,792
Cost:
$78,363
$15,623 172,897 $12,549 761 $(-680) - $16,300 - $15,623
172,897
kWh
$12,549
761
MMBtu
$(-680)
-
$
$16,300
-
%
TOTAL IMPLEMENTED Savings:
$9,797
Cost:
$2,310
$10,477 115,949 - - $(-680) - - - $10,477
115,949
kWh
-
-
MMBtu
$(-680)
-
$
-
-
%
Savings