Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2013 |
Principal Product | clinical testing material |
NAICS | 325414 - Biological Product (except Diagnostic) Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | >$500,000,000 |
# of Employees | 2,500 |
Plant Area (Sq.Ft.) | 816,975 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 8,616 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,129,049 | 53,270,599 | kWh | $0.08 |
Electricity Demand | $246,777 | 103,871 | kW-months/year | $2.38 |
Natural Gas | $2,685,863 | 214,869 | MMBtu | $12.50 |
TOTAL ENERGY COSTS | $7,061,689 | |||
RECOMMENDED SAVINGS* | $327,016 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $229,040 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION |
Savings: $166,335 Cost: $175,000 |
$159,512 | 2,058,220 | $6,823 | 2,867 | - | - | - | - |
$159,512 2,058,220 kWh |
$6,823 2,867 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $84,625 Cost: $8,800 |
- | - | - | - | $86,625 | 6,930 | $(-2,000) | - |
- - kWh |
- - kW-months/year |
$86,625 6,930 MMBtu |
$(-2,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $40,724 Cost: - |
$39,053 | 503,912 | $1,671 | 702 | - | - | - | - |
$39,053 503,912 kWh |
$1,671 702 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $14,386 Cost: $31,000 |
$13,881 | 179,116 | $505 | 212 | - | - | - | - |
$13,881 179,116 kWh |
$505 212 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,595 Cost: $800 |
$7,283 | 93,971 | $312 | 131 | - | - | - | - |
$7,283 93,971 kWh |
$312 131 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,538 Cost: $1,117 |
- | - | - | - | $6,538 | 523 | - | - |
- - kWh |
- - kW-months/year |
$6,538 523 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,023 Cost: $200 |
$3,859 | 49,790 | $164 | 69 | - | - | - | - |
$3,859 49,790 kWh |
$164 69 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,507 Cost: $2,350 |
$1,906 | 24,598 | $81 | 34 | - | - | $(-480) | - |
$1,906 24,598 kWh |
$81 34 kW-months/year |
- - MMBtu |
$(-480) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,283 Cost: $3,500 |
$1,230 | 15,871 | $53 | 22 | - | - | - | - |
$1,230 15,871 kWh |
$53 22 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $327,016 Cost: $222,767 |
$226,724 | 2,925,478 | $9,609 | 4,037 | $93,163 | 7,453 | $(-2,480) | - | $226,724 2,925,478 kWh |
$9,609 4,037 kW-months/year |
$93,163 7,453 MMBtu |
$(-2,480) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $229,040 Cost: $206,800 |
$219,729 | 2,835,219 | $9,311 | 3,912 | - | - | - | - | $219,729 2,835,219 kWh |
$9,311 3,912 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |