Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2013
Principal Product pressure sensitive films
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 150,000
Annual Production 75,000,000 Thousand Feet
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,252,832 17,932,100 kWh $0.07
Electricity Demand $238,938 36,912 kW-months/year $6.47
Natural Gas $162,804 35,998 MMBtu $4.52
TOTAL ENERGY COSTS $1,654,574
RECOMMENDED SAVINGS* $84,739 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,978
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$38,155
Cost:
$6,768
$8,540 122,171 - - $29,615 6,552 - - $8,540
122,171
kWh
-
-
kW-months/year
$29,615
6,552
MMBtu
-
-
$
02: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$17,893
Cost:
$1,000
$17,263 246,973 $2,387 369 - - $(-1,757) - $17,263
246,973
kWh
$2,387
369
kW-months/year
-
-
MMBtu
$(-1,757)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,493
Cost:
$17,640
$12,493 178,726 - - - - - - $12,493
178,726
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,702
Cost:
-
$4,094 58,573 $608 94 - - - - $4,094
58,573
kWh
$608
94
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,654
Cost:
$984
$4,052 57,968 $602 93 - - - - $4,052
57,968
kWh
$602
93
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,550
Cost:
$32
$2,265 32,407 $285 44 - - - - $2,265
32,407
kWh
$285
44
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,256
Cost:
$1,068
$1,439 20,581 $201 31 - - $(-384) - $1,439
20,581
kWh
$201
31
kW-months/year
-
-
MMBtu
$(-384)
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$987
Cost:
$2,640
$(-206) (-2,940) $(-32) (-5) $1,225 271 - - $(-206)
(-2,940)
kWh
$(-32)
(-5)
kW-months/year
$1,225
271
MMBtu
-
-
$
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$935
Cost:
$3,500
$864 12,374 $71 11 - - - - $864
12,374
kWh
$71
11
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$791
Cost:
$1,320
- - - - $791 175 - - -
-
kWh
-
-
kW-months/year
$791
175
MMBtu
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$323
Cost:
$500
- - - - $371 82 $(-48) - -
-
kWh
-
-
kW-months/year
$371
82
MMBtu
$(-48)
-
$
TOTAL RECOMMENDED Savings:
$84,739
Cost:
$35,452
$50,804 726,833 $4,122 637 $32,002 7,080 $(-2,189) - $50,804
726,833
kWh
$4,122
637
kW-months/year
$32,002
7,080
MMBtu
$(-2,189)
-
$
TOTAL IMPLEMENTED Savings:
$25,978
Cost:
$20,224
$24,343 348,255 $1,696 262 $371 82 $(-432) - $24,343
348,255
kWh
$1,696
262
kW-months/year
$371
82
MMBtu
$(-432)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes