IAC Assessment: WV0508
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0508
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2015
Principal Product bread, rolls, and buns
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 81,000
Annual Production 83,000,000 Pounds
Production Hrs. Annual 8,112
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $642,526 8,936,201 kWh $0.07
Natural Gas $372,374 57,915 MMBtu $6.43
TOTAL ENERGY COSTS $1,014,900
RECOMMENDED SAVINGS* $122,567 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,269
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption
$ kWh $ MMBtu $ $ $ Tgal
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$25,372
Cost:
$17,412
- - $25,372 3,942 - - - - -
-
kWh
$25,372
3,942
MMBtu
-
-
$
-
-
Tgal
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$24,572
Cost:
$25,343
$24,572 341,757 - - - - - - $24,572
341,757
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,607
Cost:
$81,480
$(-235) (-3,270) $11,953 1,859 - - $6,889 - $(-235)
(-3,270)
kWh
$11,953
1,859
MMBtu
-
-
$
$6,889
-
Tgal
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$14,278
Cost:
$1,000
$14,898 207,208 - - $(-620) - - - $14,898
207,208
kWh
-
-
MMBtu
$(-620)
-
$
-
-
Tgal
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$12,854
Cost:
$1,700
- - $12,905 2,007 $(-51) - - - -
-
kWh
$12,905
2,007
MMBtu
$(-51)
-
$
-
-
Tgal
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$10,108
Cost:
$7,873
- - $10,108 1,572 - - - - -
-
kWh
$10,108
1,572
MMBtu
-
-
$
-
-
Tgal
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,521
Cost:
$194
$5,521 76,794 - - - - - - $5,521
76,794
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,800
Cost:
$545
$4,212 58,576 - - $(-412) - - - $4,212
58,576
kWh
-
-
MMBtu
$(-412)
-
$
-
-
Tgal
09: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$3,639
Cost:
$5,172
- - $3,639 566 - - - - -
-
kWh
$3,639
566
MMBtu
-
-
$
-
-
Tgal
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,083
Cost:
$29
$3,083 42,874 - - - - - - $3,083
42,874
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$733
Cost:
$1,287
- - $733 114 - - - - -
-
kWh
$733
114
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$122,567
Cost:
$142,035
$52,051 723,939 $64,710 10,060 $(-1,083) - $6,889 - $52,051
723,939
kWh
$64,710
10,060
MMBtu
$(-1,083)
-
$
$6,889
-
Tgal
TOTAL IMPLEMENTED Savings:
$40,269
Cost:
$4,755
$27,714 385,452 $13,638 2,121 $(-1,083) - - - $27,714
385,452
kWh
$13,638
2,121
MMBtu
$(-1,083)
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ Tgal
Electricity Usage Natural Gas Personnel Changes Water Consumption Electricity Usage Natural Gas Personnel Changes Water Consumption