IAC Assessment: WV0557
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0557
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Wood Product Manufacturing
NAICS 321999 - All Other Miscellaneous Wood Product Manufacturing
SIC 2499 - Wood Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 750
Plant Area (Sq.Ft.) 367,000
Annual Production 49,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,516,969 37,005,671 kWh $0.04
Electricity Demand $980,823 81,414 kW-months/year $12.05
Electricity Fees $2,427,438 - $ -
Natural Gas $410,968 60,337 MMBtu $6.81
Other Energy $410,688 547,584 MMBtu $0.75
TOTAL ENERGY COSTS $5,746,982
RECOMMENDED SAVINGS* $184,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,958
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Energy Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Energy Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$65,760
Cost:
$117,200
- - - - $65,760 87,674 - - - - - - -
-
kWh
-
-
kW-months/year
$65,760
87,674
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$43,281
Cost:
$33,600
- - - - $43,281 57,708 - - - - - - -
-
kWh
-
-
kW-months/year
$43,281
57,708
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$22,313
Cost:
$25,000
$22,313 544,216 - - - - - - - - - - $22,313
544,216
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$13,930
Cost:
$2,320
$7,530 183,656 $6,640 551 - - - - - - $(-240) - $7,530
183,656
kWh
$6,640
551
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-240)
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$14,479
Cost:
$27,450
$7,948 193,862 $6,531 542 - - - - - - - - $7,948
193,862
kWh
$6,531
542
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,808
Cost:
-
$6,277 153,087 $5,531 459 - - - - - - - - $6,277
153,087
kWh
$5,531
459
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,480
Cost:
$16,000
- - - - $3,480 4,645 - - - - - - -
-
kWh
-
-
kW-months/year
$3,480
4,645
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,390
Cost:
$1,950
$1,799 43,885 $1,591 132 - - - - - - - - $1,799
43,885
kWh
$1,591
132
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 3.4151 MINIMIZE WATER USAGE Savings:
$2,486
Cost:
$5,600
- - - - - - $3,425 582 $96 582 $(-1,035) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,425
582
Tgal
$96
582
Tgal
$(-1,035)
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,424
Cost:
$90
$1,291 31,479 $1,133 94 - - - - - - - - $1,291
31,479
kWh
$1,133
94
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,022
Cost:
$1,365
$540 13,170 $482 40 - - - - - - - - $540
13,170
kWh
$482
40
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$508
Cost:
$2,480
$267 6,503 $241 20 - - - - - - - - $267
6,503
kWh
$241
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$184,881
Cost:
$233,055
$47,965 1,169,858 $22,149 1,838 $112,521 150,027 $3,425 582 $96 582 $(-1,275) - $47,965
1,169,858
kWh
$22,149
1,838
kW-months/year
$112,521
150,027
MMBtu
$3,425
582
Tgal
$96
582
Tgal
$(-1,275)
-
$
TOTAL IMPLEMENTED Savings:
$137,958
Cost:
$183,050
$15,745 384,021 $13,412 1,113 $109,041 145,382 - - - - $(-240) - $15,745
384,021
kWh
$13,412
1,113
kW-months/year
$109,041
145,382
MMBtu
-
-
Tgal
-
-
Tgal
$(-240)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Other Energy Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Other Energy Water Usage Water Disposal One-time Revenue or Avoided Cost