IAC Assessment: WV0563
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0563
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Automobile plastic parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 590,000
Annual Production 90,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,749,076 43,162,347 kWh $0.09
Electricity Demand $659,585 82,448 kW-months/year $8.00
Natural Gas $846,973 182,370 MMBtu $4.64
TOTAL ENERGY COSTS $5,255,634
RECOMMENDED SAVINGS* $238,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,468
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$85,272
Cost:
$36,000
$85,272 981,280 - - - - - - - - $85,272
981,280
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$83,489
Cost:
$54,000
$83,489 960,744 - - - - - - - - $83,489
960,744
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$35,888
Cost:
$173,323
$24,072 277,004 $11,816 1,477 - - - - - - $24,072
277,004
kWh
$11,816
1,477
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$20,002
Cost:
$754
$18,114 208,444 $2,288 286 - - $(-400) - - - $18,114
208,444
kWh
$2,288
286
kW-months/year
-
-
MMBtu
$(-400)
-
$
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,206
Cost:
$59,750
$12,206 140,458 - - - - - - - - $12,206
140,458
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$1,202
Cost:
$1,400
- - - - - - $(-1,400) - $2,602 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$(-1,400)
-
$
$2,602
-
Tgal
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$264
Cost:
$235
- - - - $264 57 - - - - -
-
kWh
-
-
kW-months/year
$264
57
MMBtu
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$238,323
Cost:
$325,462
$223,153 2,567,930 $14,104 1,763 $264 57 $(-1,800) - $2,602 - $223,153
2,567,930
kWh
$14,104
1,763
kW-months/year
$264
57
MMBtu
$(-1,800)
-
$
$2,602
-
Tgal
TOTAL IMPLEMENTED Savings:
$21,468
Cost:
$2,389
$18,114 208,444 $2,288 286 $264 57 $(-1,800) - $2,602 - $18,114
208,444
kWh
$2,288
286
kW-months/year
$264
57
MMBtu
$(-1,800)
-
$
$2,602
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption