Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2018 |
Principal Product | Automobile plastic parts |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 1,000 |
Plant Area (Sq.Ft.) | 590,000 |
Annual Production | 90,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,749,076 | 43,162,347 | kWh | $0.09 |
Electricity Demand | $659,585 | 82,448 | kW-months/year | $8.00 |
Natural Gas | $846,973 | 182,370 | MMBtu | $4.64 |
TOTAL ENERGY COSTS | $5,255,634 | |||
RECOMMENDED SAVINGS* | $238,323 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $21,468 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $85,272 Cost: $36,000 |
$85,272 | 981,280 | - | - | - | - | - | - | - | - |
$85,272 981,280 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $83,489 Cost: $54,000 |
$83,489 | 960,744 | - | - | - | - | - | - | - | - |
$83,489 960,744 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $35,888 Cost: $173,323 |
$24,072 | 277,004 | $11,816 | 1,477 | - | - | - | - | - | - |
$24,072 277,004 kWh |
$11,816 1,477 kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $20,002 Cost: $754 |
$18,114 | 208,444 | $2,288 | 286 | - | - | $(-400) | - | - | - |
$18,114 208,444 kWh |
$2,288 286 kW-months/year |
- - MMBtu |
$(-400) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,206 Cost: $59,750 |
$12,206 | 140,458 | - | - | - | - | - | - | - | - |
$12,206 140,458 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4151 MINIMIZE WATER USAGE |
Savings: $1,202 Cost: $1,400 |
- | - | - | - | - | - | $(-1,400) | - | $2,602 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$(-1,400) - $ |
$2,602 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $264 Cost: $235 |
- | - | - | - | $264 | 57 | - | - | - | - |
- - kWh |
- - kW-months/year |
$264 57 MMBtu |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $238,323 Cost: $325,462 |
$223,153 | 2,567,930 | $14,104 | 1,763 | $264 | 57 | $(-1,800) | - | $2,602 | - | $223,153 2,567,930 kWh |
$14,104 1,763 kW-months/year |
$264 57 MMBtu |
$(-1,800) - $ |
$2,602 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $21,468 Cost: $2,389 |
$18,114 | 208,444 | $2,288 | 286 | $264 | 57 | $(-1,800) | - | $2,602 | - | $18,114 208,444 kWh |
$2,288 286 kW-months/year |
$264 57 MMBtu |
$(-1,800) - $ |
$2,602 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Water Consumption |