IAC logo
IAC Assessment: WV0564
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0564
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2018
Principal Product Water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 16
Plant Area (Sq.Ft.) 850,000
Annual Production 4,015,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $659,210 10,608,544 kWh $0.06
Electricity Fees $59,736 - $ -
TOTAL ENERGY COSTS $718,946
RECOMMENDED SAVINGS* $168,565 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $159,352
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$138,212
Cost:
$160,200
$138,212 2,225,641 - - - - $138,212
2,225,641
kWh
-
-
$
-
-
$
02: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$16,975
Cost:
$1,000
$19,445 313,128 $(-2,470) - - - $19,445
313,128
kWh
$(-2,470)
-
$
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,662
Cost:
$533
$5,862 94,391 - - $(-200) - $5,862
94,391
kWh
-
-
$
$(-200)
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,275
Cost:
$4,000
$3,275 52,735 - - - - $3,275
52,735
kWh
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,126
Cost:
$2,051
$3,126 50,342 - - - - $3,126
50,342
kWh
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,039
Cost:
$4,000
$1,039 16,732 - - - - $1,039
16,732
kWh
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$276
Cost:
$785
$276 4,446 - - - - $276
4,446
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$168,565
Cost:
$172,569
$171,235 2,757,415 $(-2,470) - $(-200) - $171,235
2,757,415
kWh
$(-2,470)
-
$
$(-200)
-
$
TOTAL IMPLEMENTED Savings:
$159,352
Cost:
$167,251
$161,822 2,605,843 $(-2,470) - - - $161,822
2,605,843
kWh
$(-2,470)
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes