IAC Assessment: WV0571
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0571
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2019
Principal Product Wood Products
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 250,000
Annual Production 15,000 Thousand Feet
Production Hrs. Annual 2,500
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $279,928 4,143,686 kWh $0.07
Electricity Demand $132,372 13,587 kW-months/year $9.74
Electricity Fees $8,974 - $ -
Natural Gas $15,826 1,835 MMBtu $8.62
Wood $360,000 192,000 MMBtu $1.88
TOTAL ENERGY COSTS $797,100
RECOMMENDED SAVINGS* $84,833 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,510
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$21,112
Cost:
$1,000
$13,695 202,592 $9,467 972 - - $(-2,050) - $13,695
202,592
kWh
$9,467
972
kW-months/year
-
-
MMBtu
$(-2,050)
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$17,040
Cost:
$19,272
$10,066 148,907 $6,974 716 - - - - $10,066
148,907
kWh
$6,974
716
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,334
Cost:
$3,500
- - - - $15,484 8,258 $(-150) - -
-
kWh
-
-
kW-months/year
$15,484
8,258
MMBtu
$(-150)
-
$
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$11,713
Cost:
$2,200
- - - - $11,713 6,247 - - -
-
kWh
-
-
kW-months/year
$11,713
6,247
MMBtu
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,475
Cost:
$8,000
$5,475 80,998 - - - - - - $5,475
80,998
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,044
Cost:
-
$2,993 44,291 $2,051 213 - - - - $2,993
44,291
kWh
$2,051
213
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,135
Cost:
$4,150
$4,135 61,169 - - - - - - $4,135
61,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,383
Cost:
$763
$2,234 33,041 $1,549 159 - - $(-400) - $2,234
33,041
kWh
$1,549
159
kW-months/year
-
-
MMBtu
$(-400)
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,597
Cost:
$8,060
- - - - $1,597 852 - - -
-
kWh
-
-
kW-months/year
$1,597
852
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$84,833
Cost:
$46,945
$38,598 570,998 $20,041 2,060 $28,794 15,357 $(-2,600) - $38,598
570,998
kWh
$20,041
2,060
kW-months/year
$28,794
15,357
MMBtu
$(-2,600)
-
$
TOTAL IMPLEMENTED Savings:
$63,510
Cost:
$32,595
$28,988 428,831 $20,041 2,060 $17,081 9,110 $(-2,600) - $28,988
428,831
kWh
$20,041
2,060
kW-months/year
$17,081
9,110
MMBtu
$(-2,600)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Wood Personnel Changes Electricity Usage Electricity Demand Wood Personnel Changes