IAC logo
IAC Assessment: WV0572
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0572
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2019
Principal Product Waste Water Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 9
Plant Area (Sq.Ft.) 460,000
Annual Production 2,060,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $343,479 3,585,000 kWh $0.10
Electricity Demand $58,968 7,560 kW-months/year $7.80
Natural Gas $7,446 967 MMBtu $7.70
TOTAL ENERGY COSTS $409,893
RECOMMENDED SAVINGS* $39,515 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,006
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$12,987
Cost:
$1,000
$13,836 144,426 - - - - $(-849) - $13,836
144,426
kWh
-
-
kW-months/year
-
-
$
$(-849)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,442
Cost:
$38,062
$6,442 67,247 - - - - - - $6,442
67,247
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4313 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT Savings:
$6,835
Cost:
$6,336
$6,149 64,188 $686 88 - - - - $6,149
64,188
kWh
$686
88
kW-months/year
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,205
Cost:
$2,889
$4,573 47,733 $632 81 - - - - $4,573
47,733
kWh
$632
81
kW-months/year
-
-
$
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,814
Cost:
$587
$2,724 28,435 $304 39 - - $(-214) - $2,724
28,435
kWh
$304
39
kW-months/year
-
-
$
$(-214)
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,232
Cost:
$5,400
- - - - $5,232 - - - -
-
kWh
-
-
kW-months/year
$5,232
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,515
Cost:
$54,274
$33,724 352,029 $1,622 208 $5,232 - $(-1,063) - $33,724
352,029
kWh
$1,622
208
kW-months/year
$5,232
-
$
$(-1,063)
-
$
TOTAL IMPLEMENTED Savings:
$21,006
Cost:
$4,476
$21,133 220,594 $936 120 - - $(-1,063) - $21,133
220,594
kWh
$936
120
kW-months/year
-
-
$
$(-1,063)
-
$