IAC logo
IAC Assessment: WV0591
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0591
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2020
Principal Product Fuel Managemnt Devices
NAICS 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824 - Fluid Meters And Counting Devices
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 150,000
Annual Production 20,000 Units
Production Hrs. Annual 8,760
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,107 4,019,596 kWh $0.05
Electricity Demand $44,734 9,694 kW-months/year $4.61
Electricity Fees $34,092 - $ -
Natural Gas $40,284 16,440 MMBtu $2.45
TOTAL ENERGY COSTS $335,217
RECOMMENDED SAVINGS* $33,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,116
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$10,092
Cost:
$27,700
- - - - $10,092 4,119 - - -
-
kWh
-
-
kW-months/year
$10,092
4,119
MMBtu
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,029
Cost:
$6,375
$6,029 112,068 - - - - - - $6,029
112,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,927
Cost:
$4,625
$4,927 91,583 - - - - - - $4,927
91,583
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,574
Cost:
$1,468
$3,199 59,462 $375 82 - - - - $3,199
59,462
kWh
$375
82
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,647
Cost:
$958
$2,370 44,061 $277 60 - - - - $2,370
44,061
kWh
$277
60
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,896
Cost:
$1,770
$1,697 31,531 $199 43 - - - - $1,697
31,531
kWh
$199
43
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$1,752
Cost:
$4,700
- - - - $1,752 715 - - -
-
kWh
-
-
kW-months/year
$1,752
715
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$834
Cost:
$50
$746 13,875 $88 19 - - - - $746
13,875
kWh
$88
19
kW-months/year
-
-
MMBtu
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$944
Cost:
$338
$944 17,545 - - - - - - $944
17,545
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$507
Cost:
$2,500
- - - - $657 268 $(-150) - -
-
kWh
-
-
kW-months/year
$657
268
MMBtu
$(-150)
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$151
Cost:
$373
- - - - $151 62 - - -
-
kWh
-
-
kW-months/year
$151
62
MMBtu
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$98
Cost:
$360
- - - - $98 40 - - -
-
kWh
-
-
kW-months/year
$98
40
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$33,451
Cost:
$51,217
$19,912 370,125 $939 204 $12,750 5,204 $(-150) - $19,912
370,125
kWh
$939
204
kW-months/year
$12,750
5,204
MMBtu
$(-150)
-
$
TOTAL IMPLEMENTED Savings:
$30,116
Cost:
$46,537
$17,469 324,719 $652 142 $11,995 4,896 - - $17,469
324,719
kWh
$652
142
kW-months/year
$11,995
4,896
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes