IAC Assessment: WV0596
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0596
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2020
Principal Product Plastic Tubing
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 131
Plant Area (Sq.Ft.) 111,902
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) OH
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,832 4,152,840 kWh $0.05
Electricity Demand $62,880 10,230 kW-months/year $6.15
Electricity Fees $3,605 - $ -
Natural Gas $121,103 55,605 MMBtu $2.18
TOTAL ENERGY COSTS $414,420
RECOMMENDED SAVINGS* $155,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 4.641 ELIMINATE SHUTDOWNS OF CONTROLS DUE TO OVERHEATING Savings:
$103,798
Cost:
$40,718
$(-25,416) (-465,486) $(-5,504) (-895) - - - - $134,718 - $(-25,416)
(-465,486)
kWh
$(-5,504)
(-895)
kW-months/year
-
-
MMBtu
-
-
$
$134,718
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,186
Cost:
$20,034
$7,509 137,520 $677 110 - - - - - - $7,509
137,520
kWh
$677
110
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$7,560
Cost:
$7,967
$6,213 113,788 $1,347 219 - - - - - - $6,213
113,788
kWh
$1,347
219
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$6,964
Cost:
$30
$5,722 104,807 $1,242 202 - - - - - - $5,722
104,807
kWh
$1,242
202
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,754
Cost:
$7,949
$5,727 86,971 $1,027 167 - - - - - - $5,727
86,971
kWh
$1,027
167
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,079
Cost:
$10,000
$6,079 111,342 - - - - - - - - $6,079
111,342
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,729
Cost:
$1,600
$3,065 56,140 $664 108 - - - - - - $3,065
56,140
kWh
$664
108
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$3,333
Cost:
$14,200
$(-1,663) (-30,456) $(-363) (-59) $5,659 2,596 $(-300) - - - $(-1,663)
(-30,456)
kWh
$(-363)
(-59)
kW-months/year
$5,659
2,596
MMBtu
$(-300)
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,311
Cost:
$1,566
$1,552 28,421 $240 39 $519 238 - - - - $1,552
28,421
kWh
$240
39
kW-months/year
$519
238
MMBtu
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,829
Cost:
-
$1,509 27,631 $320 52 - - - - - - $1,509
27,631
kWh
$320
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
11: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,750
Cost:
$372
$1,538 28,165 $332 54 - - $(-120) - - - $1,538
28,165
kWh
$332
54
kW-months/year
-
-
MMBtu
$(-120)
-
$
-
-
$
12: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,108
Cost:
$1,828
$910 16,680 $198 32 - - - - - - $910
16,680
kWh
$198
32
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$746
Cost:
$60
$613 11,218 $133 22 - - - - - - $613
11,218
kWh
$133
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$626
Cost:
$4,034
- - - - $626 287 - - - - -
-
kWh
-
-
kW-months/year
$626
287
MMBtu
-
-
$
-
-
$
15: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$507
Cost:
$700
$1,451 26,574 $221 36 - - $(-1,165) - - - $1,451
26,574
kWh
$221
36
kW-months/year
-
-
MMBtu
$(-1,165)
-
$
-
-
$
16: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$326
Cost:
$1,500
- - - - $506 232 $(-180) - - - -
-
kWh
-
-
kW-months/year
$506
232
MMBtu
$(-180)
-
$
-
-
$
17: 2.2511 INSULATE BARE EQUIPMENT Savings:
$308
Cost:
$85
$308 5,641 - - - - - - - - $308
5,641
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$155,914
Cost:
$112,643
$15,117 258,956 $534 87 $7,310 3,353 $(-1,765) - $134,718 - $15,117
258,956
kWh
$534
87
kW-months/year
$7,310
3,353
MMBtu
$(-1,765)
-
$
$134,718
-
$
TOTAL IMPLEMENTED Savings:
$143,480
Cost:
$98,328
$9,241 151,333 $(-665) (-108) $1,651 757 $(-1,465) - $134,718 - $9,241
151,333
kWh
$(-665)
(-108)
kW-months/year
$1,651
757
MMBtu
$(-1,465)
-
$
$134,718
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost