IAC Assessment: WV0604
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0604
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Pressure Regulators
NAICS 334513 - Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3569 - General Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 124
Plant Area (Sq.Ft.) 215,219
Annual Production 50,000 Pieces
Production Hrs. Annual 5,200
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $252,037 6,200,627 kWh $0.04
Electricity Demand $317,692 19,565 kW-months/year $16.24
Electricity Fees $2,257 - $ -
Natural Gas $40,354 21,042 MMBtu $1.92
TOTAL ENERGY COSTS $612,340
RECOMMENDED SAVINGS* $82,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,687
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,454
Cost:
$75,747
$14,796 364,438 $13,658 841 - - - - $14,796
364,438
kWh
$13,658
841
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$20,602
Cost:
$23,284
$10,078 248,225 $10,524 648 - - - - $10,078
248,225
kWh
$10,524
648
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$18,040
Cost:
$7,122
$8,148 200,682 $7,519 463 $2,373 1,236 - - $8,148
200,682
kWh
$7,519
463
kW-months/year
$2,373
1,236
MMBtu
-
-
$
04: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$4,330
Cost:
$1,500
$3,127 77,012 $2,891 178 - - $(-1,688) - $3,127
77,012
kWh
$2,891
178
kW-months/year
-
-
MMBtu
$(-1,688)
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,431
Cost:
$403
$2,213 54,502 $1,218 75 - - - - $2,213
54,502
kWh
$1,218
75
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,500
Cost:
$1,792
$1,298 31,980 $1,202 74 - - - - $1,298
31,980
kWh
$1,202
74
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,749
Cost:
$672
$1,489 36,663 $1,380 85 - - $(-1,120) - $1,489
36,663
kWh
$1,380
85
kW-months/year
-
-
MMBtu
$(-1,120)
-
$
08: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$1,727
Cost:
$6,630
$1,137 27,993 $590 36 - - - - $1,137
27,993
kWh
$590
36
kW-months/year
-
-
MMBtu
-
-
$
09: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,302
Cost:
$4,100
- - - - $1,407 733 $(-105) - -
-
kWh
-
-
kW-months/year
$1,407
733
MMBtu
$(-105)
-
$
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$733
Cost:
$35
$473 11,641 $260 16 - - - - $473
11,641
kWh
$260
16
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$82,868
Cost:
$121,285
$42,759 1,053,136 $39,242 2,416 $3,780 1,969 $(-2,913) - $42,759
1,053,136
kWh
$39,242
2,416
kW-months/year
$3,780
1,969
MMBtu
$(-2,913)
-
$
TOTAL IMPLEMENTED Savings:
$52,687
Cost:
$38,908
$26,826 660,705 $24,994 1,539 $3,780 1,969 $(-2,913) - $26,826
660,705
kWh
$24,994
1,539
kW-months/year
$3,780
1,969
MMBtu
$(-2,913)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes