IAC Assessment: WV0605
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0605
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Automotive Stamping
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469 - Metal Stampings, Nec
Sales $50,000,000-$100,000,000
# of Employees 600
Plant Area (Sq.Ft.) 933,390
Annual Production 75,000 Units
Production Hrs. Annual 7,488
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,284,677 39,240,000 kWh $0.03
Electricity Demand $1,247,064 76,836 kW-months/year $16.23
Electricity Fees $37,546 - $ -
Natural Gas $363,020 107,657 MMBtu $3.37
TOTAL ENERGY COSTS $3,015,254
RECOMMENDED SAVINGS* $239,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,973
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$59,363
Cost:
$10,625
$33,973 1,038,917 $25,390 1,565 - - - - - - - - $33,973
1,038,917
kWh
$25,390
1,565
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$37,902
Cost:
$115,920
$(-1,831) (-55,994) $(-121) (-7) $39,854 11,826 - - - - - - $(-1,831)
(-55,994)
kWh
$(-121)
(-7)
kW-months/year
$39,854
11,826
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$29,737
Cost:
$10,000
- - - - - - $14,365 1,306 $17,372 1,306 $(-2,000) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,365
1,306
Tgal
$17,372
1,306
Tgal
$(-2,000)
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$20,502
Cost:
$2,155
$11,561 353,570 $8,941 551 - - - - - - - - $11,561
353,570
kWh
$8,941
551
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$18,719
Cost:
$125
$11,140 340,679 $7,579 467 - - - - - - - - $11,140
340,679
kWh
$7,579
467
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$14,806
Cost:
$683
$8,423 257,588 $6,703 413 - - - - - - $(-320) - $8,423
257,588
kWh
$6,703
413
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-320)
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$13,015
Cost:
$4,100
- - - - $18,265 5,420 - - - - $(-5,250) - -
-
kWh
-
-
kW-months/year
$18,265
5,420
MMBtu
-
-
Tgal
-
-
Tgal
$(-5,250)
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,600
Cost:
$1,326
$7,017 214,594 $5,583 344 - - - - - - - - $7,017
214,594
kWh
$5,583
344
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$10,833
Cost:
$1,500
$7,487 228,967 $5,096 314 - - - - - - $(-1,750) - $7,487
228,967
kWh
$5,096
314
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
$(-1,750)
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,864
Cost:
$20,709
$4,936 150,958 $3,928 242 - - - - - - - - $4,936
150,958
kWh
$3,928
242
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,929
Cost:
$10,915
- - - - $6,929 2,056 - - - - - - -
-
kWh
-
-
kW-months/year
$6,929
2,056
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
12: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,500
Cost:
$30,000
$4,861 148,659 $1,639 101 - - - - - - - - $4,861
148,659
kWh
$1,639
101
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$239,770
Cost:
$208,058
$87,567 2,677,938 $64,738 3,989 $65,048 19,302 $14,365 1,306 $17,372 1,306 $(-9,320) - $87,567
2,677,938
kWh
$64,738
3,989
kW-months/year
$65,048
19,302
MMBtu
$14,365
1,306
Tgal
$17,372
1,306
Tgal
$(-9,320)
-
$
TOTAL IMPLEMENTED Savings:
$69,973
Cost:
$7,734
$34,067 1,041,828 $24,961 1,538 $18,265 5,420 - - - - $(-7,320) - $34,067
1,041,828
kWh
$24,961
1,538
kW-months/year
$18,265
5,420
MMBtu
-
-
Tgal
-
-
Tgal
$(-7,320)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Personnel Changes