IAC logo
IAC Assessment: WV0606
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0606
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Plastic prodcuts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 565,000
Annual Production 4,657 Tons
Production Hrs. Annual 8,760
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $773,326 14,197,293 kWh $0.05
Electricity Demand $207,594 15,932 kW-months/year $13.03
Electricity Fees $480 - $ -
TOTAL ENERGY COSTS $981,400
RECOMMENDED SAVINGS* $199,765 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,934
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$173,936
Cost:
$85,154
$131,028 2,404,177 $42,908 3,293 - - $131,028
2,404,177
kWh
$42,908
3,293
kW-months/year
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$9,895
Cost:
$1,511
$7,456 136,816 $2,439 187 - - $7,456
136,816
kWh
$2,439
187
kW-months/year
-
-
$
03: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$7,177
Cost:
$729
$6,009 110,255 $1,968 151 $(-800) - $6,009
110,255
kWh
$1,968
151
kW-months/year
$(-800)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,685
Cost:
$50
$3,525 64,684 $1,160 89 - - $3,525
64,684
kWh
$1,160
89
kW-months/year
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,253
Cost:
$314
$1,693 31,058 $560 43 - - $1,693
31,058
kWh
$560
43
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,819
Cost:
$595
$1,363 25,018 $456 35 - - $1,363
25,018
kWh
$456
35
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$199,765
Cost:
$88,353
$151,074 2,772,008 $49,491 3,798 $(-800) - $151,074
2,772,008
kWh
$49,491
3,798
kW-months/year
$(-800)
-
$
TOTAL IMPLEMENTED Savings:
$15,934
Cost:
$1,688
$12,590 231,015 $4,144 318 $(-800) - $12,590
231,015
kWh
$4,144
318
kW-months/year
$(-800)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes