IAC logo
IAC Assessment: WV0611
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0611
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Solid Recovered Fuel
NAICS 562920 - Materials Recovery Facilities
SIC 4953 - Refuse Systems
Sales $1,000,000-$5,000,000
# of Employees 5
Plant Area (Sq.Ft.) 56,000
Annual Production 62,290 Tons
Production Hrs. Annual 4,680
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,802 2,590,689 kWh $0.03
Electricity Demand $171,265 10,614 kW-months/year $16.14
Electricity Fees $41,829 - $ -
TOTAL ENERGY COSTS $300,896
RECOMMENDED SAVINGS* $10,209 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,368
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,448
Cost:
$734
$1,480 43,656 $968 60 - - $1,480
43,656
kWh
$968
60
kW-months/year
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,923
Cost:
$240
$858 25,319 $1,065 66 - - $858
25,319
kWh
$1,065
66
kW-months/year
-
-
$
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$1,803
Cost:
$3,254
$1,260 37,162 $1,243 77 $(-700) - $1,260
37,162
kWh
$1,243
77
kW-months/year
$(-700)
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,767
Cost:
$2,029
$799 23,570 $968 60 - - $799
23,570
kWh
$968
60
kW-months/year
-
-
$
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,003
Cost:
$761
$622 18,341 $613 38 $(-232) - $622
18,341
kWh
$613
38
kW-months/year
$(-232)
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$830
Cost:
$4,080
$669 19,730 $161 10 - - $669
19,730
kWh
$161
10
kW-months/year
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$244
Cost:
$1,213
$148 4,350 $96 6 - - $148
4,350
kWh
$96
6
kW-months/year
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$191
Cost:
$29
$110 3,228 $81 5 - - $110
3,228
kWh
$81
5
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$10,209
Cost:
$12,340
$5,946 175,356 $5,195 322 $(-932) - $5,946
175,356
kWh
$5,195
322
kW-months/year
$(-932)
-
$
TOTAL IMPLEMENTED Savings:
$7,368
Cost:
$5,018
$4,330 127,706 $3,970 246 $(-932) - $4,330
127,706
kWh
$3,970
246
kW-months/year
$(-932)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes