Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2021 |
Principal Product | Solid Recovered Fuel |
NAICS | 562920 - Materials Recovery Facilities |
SIC | 4953 - Refuse Systems |
Sales | $1,000,000-$5,000,000 |
# of Employees | 5 |
Plant Area (Sq.Ft.) | 56,000 |
Annual Production | 62,290 Tons |
Production Hrs. Annual | 4,680 |
Location (State) | WV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,802 | 2,590,689 | kWh | $0.03 |
Electricity Demand | $171,265 | 10,614 | kW-months/year | $16.14 |
Electricity Fees | $41,829 | - | $ | - |
TOTAL ENERGY COSTS | $300,896 | |||
RECOMMENDED SAVINGS* | $10,209 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,368 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,448 Cost: $734 |
$1,480 | 43,656 | $968 | 60 | - | - |
$1,480 43,656 kWh |
$968 60 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,923 Cost: $240 |
$858 | 25,319 | $1,065 | 66 | - | - |
$858 25,319 kWh |
$1,065 66 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM |
Savings: $1,803 Cost: $3,254 |
$1,260 | 37,162 | $1,243 | 77 | $(-700) | - |
$1,260 37,162 kWh |
$1,243 77 kW-months/year |
$(-700) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,767 Cost: $2,029 |
$799 | 23,570 | $968 | 60 | - | - |
$799 23,570 kWh |
$968 60 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $1,003 Cost: $761 |
$622 | 18,341 | $613 | 38 | $(-232) | - |
$622 18,341 kWh |
$613 38 kW-months/year |
$(-232) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $830 Cost: $4,080 |
$669 | 19,730 | $161 | 10 | - | - |
$669 19,730 kWh |
$161 10 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $244 Cost: $1,213 |
$148 | 4,350 | $96 | 6 | - | - |
$148 4,350 kWh |
$96 6 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $191 Cost: $29 |
$110 | 3,228 | $81 | 5 | - | - |
$110 3,228 kWh |
$81 5 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $10,209 Cost: $12,340 |
$5,946 | 175,356 | $5,195 | 322 | $(-932) | - | $5,946 175,356 kWh |
$5,195 322 kW-months/year |
$(-932) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,368 Cost: $5,018 |
$4,330 | 127,706 | $3,970 | 246 | $(-932) | - | $4,330 127,706 kWh |
$3,970 246 kW-months/year |
$(-932) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Electricity Usage | Electricity Demand | Personnel Changes |