IAC Assessment: WV0613
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0613
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Sheet glass
NAICS 327211 - Flat Glass Manufacturing
SIC 3211 - Flat Glass
Sales $1,000,000-$5,000,000
# of Employees 36
Plant Area (Sq.Ft.) 100,000
Annual Production 5,000,000 Units
Production Hrs. Annual 2,700
Location (State) WV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $13,207 295,552 kWh $0.04
Electricity Demand $13,760 901 kW-months/year $15.27
Electricity Fees $2,551 - $ -
Natural Gas $429,134 245,841 MMBtu $1.75
TOTAL ENERGY COSTS $458,652
RECOMMENDED SAVINGS* $56,692 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,721
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,166
Cost:
$73,920
$(-731) (-16,345) - - $17,897 10,227 - - $(-731)
(-16,345)
kWh
-
-
kW-months/year
$17,897
10,227
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,135
Cost:
$10,700
- - - - $11,615 6,637 $(-480) - -
-
kWh
-
-
kW-months/year
$11,615
6,637
MMBtu
$(-480)
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$11,092
Cost:
$53,040
- - - - $11,092 6,338 - - -
-
kWh
-
-
kW-months/year
$11,092
6,338
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,812
Cost:
$30,758
- - - - $10,812 6,178 - - -
-
kWh
-
-
kW-months/year
$10,812
6,178
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,713
Cost:
$7,054
$1,054 23,588 $2,659 174 - - - - $1,054
23,588
kWh
$2,659
174
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,061
Cost:
$3,373
$778 17,399 $1,283 84 - - - - $778
17,399
kWh
$1,283
84
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$536
Cost:
$96
$215 4,814 $321 21 - - - - $215
4,814
kWh
$321
21
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$177
Cost:
$40
$70 1,560 $107 7 - - - - $70
1,560
kWh
$107
7
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,692
Cost:
$178,981
$1,386 31,016 $4,370 286 $51,416 29,380 $(-480) - $1,386
31,016
kWh
$4,370
286
kW-months/year
$51,416
29,380
MMBtu
$(-480)
-
$
TOTAL IMPLEMENTED Savings:
$24,721
Cost:
$44,967
$1,063 23,773 $1,711 112 $22,427 12,815 $(-480) - $1,063
23,773
kWh
$1,711
112
kW-months/year
$22,427
12,815
MMBtu
$(-480)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost