IAC Assessment: WV0615
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0615
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2021
Principal Product Rubber Product
NAICS 326291 - Rubber Product Manufacturing for Mechanical Use
SIC 3061 - Mechanical Rubber Goods
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 92,350
Annual Production 12,120,000 Units
Production Hrs. Annual 7,488
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,130 7,301,328 kWh $0.05
Electricity Demand $190,290 19,771 kW-months/year $9.62
Electricity Fees $77,242 - $ -
Natural Gas $129,875 61,892 MMBtu $2.10
TOTAL ENERGY COSTS $730,537
RECOMMENDED SAVINGS* $31,769 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,583
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,661
Cost:
$16,998
$6,920 151,756 $1,741 181 - - - - - - $6,920
151,756
kWh
$1,741
181
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,040
Cost:
$233
$5,462 119,786 $1,578 164 - - - - - - $5,462
119,786
kWh
$1,578
164
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,561
Cost:
$13,105
- - - - - - - - $4,561 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,561
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,209
Cost:
$13,902
- - - - $3,209 1,528 - - - - -
-
kWh
-
-
kW-months/year
$3,209
1,528
MMBtu
-
-
$
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,781
Cost:
$2,300
- - - - $2,781 1,341 - - - - -
-
kWh
-
-
kW-months/year
$2,781
1,341
MMBtu
-
-
$
-
-
$
06: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$2,598
Cost:
$5,175
$2,106 46,189 $702 73 - - $(-210) - - - $2,106
46,189
kWh
$702
73
kW-months/year
-
-
MMBtu
$(-210)
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$944
Cost:
$70
$703 15,422 $241 25 - - - - - - $703
15,422
kWh
$241
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$913
Cost:
$688
$682 14,946 $231 24 - - - - - - $682
14,946
kWh
$231
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$755
Cost:
$3,140
$563 12,343 $192 20 - - - - - - $563
12,343
kWh
$192
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$307
Cost:
$1,000
$1,754 38,461 $596 62 - - $(-2,043) - - - $1,754
38,461
kWh
$596
62
kW-months/year
-
-
MMBtu
$(-2,043)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$31,769
Cost:
$56,611
$18,190 398,903 $5,281 549 $5,990 2,869 $(-2,253) - $4,561 - $18,190
398,903
kWh
$5,281
549
kW-months/year
$5,990
2,869
MMBtu
$(-2,253)
-
$
$4,561
-
$
TOTAL IMPLEMENTED Savings:
$14,583
Cost:
$9,466
$10,707 234,804 $3,348 348 $2,781 1,341 $(-2,253) - - - $10,707
234,804
kWh
$3,348
348
kW-months/year
$2,781
1,341
MMBtu
$(-2,253)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes